CASO Construction Orders ( Signal Department )
|
DATE OF ORDER |
ORDER # |
LOCATION |
WORK DESCRIPTION |
DATE COMPLETED |
COST (OF SIGNAL DEPT WORK) |
|
Feb 25/25 |
2819 |
NIAGARA RIVER |
CHANGING THE EASTBOUND AUTOMATIC BLOCK SIGNALING AND INSTALLATION OF ADDITIONAL SIGNALING ACCOUNT OF NEW BRIDGE |
Aug 28/26 |
|
|
Aug 11/25 |
2958 |
RIDGETOWN TO WINDSOR TOWER #4 |
RECONSTRUCTION OF ELECTRIC LINE BETWEEN RIDGETOWN AND WINDSOR TOWER #4 |
Jun 12/26 |
|
|
Sep 1/25 |
2934 |
WINDSOR |
WESTBOUND CLASSIFICATION YARD - INSTALL ELECTRICAL CONNECTIONS FOR AIR BRAKE TESTING FACILITIES |
Jan 4/26 |
$11,080.00 |
|
Sep 15/25 |
3009 |
HAGERSVILLE |
REPLACE 3 WIRE CONNECTED DWARF SIGNALS WITH ELECTRIC COLOUR LIGHT SIGNALS AND SLOTTED #7 WITH TOP POST MECHANISM |
Apr 25/26 |
|
|
Nov 15/25 |
3056 |
TILBURY |
REPLACE GASOLINE PUMP IN PUMPING STATION WITH ELECTRICALLY DRIVEN PUMP |
Sep 5/26 |
|
|
Dec 5/25 |
3064 |
WELLAND |
INSTALL UNDERWATER CABLE FOR TH&B AT WELLAND DRAWBRIDGE |
Jul 20/28 |
|
|
Dec 9/25 |
3075 |
WATERFORD |
INSTALL ELECTRIC LIGHTS IN PUMP HOUSE AND TRACK TANK BOILER HOUSE |
Apr 19/26 |
$180.00 |
|
Feb 3/26 |
3118 |
WELLAND |
INSTALL AUTOMATIC STARTER IN PUMPING PLANT |
Jun 10/26 |
|
|
Feb 6/26 |
3124 |
TILLSONBURG |
CONNECT MOTOR TO OPERATE CENTRIFUGAL PUMP |
Nov 4/26 |
|
|
Feb 19/26 |
3136 |
NIAGARA RIVER |
INSTALL ELECTRIC LIGHTS IN 9' X 14' BUILDING AT WEST END OF NIAGARA RIVER BRIDGE |
Mar 4/26 |
|
|
Mar 4/26 |
3157 |
ST. THOMAS |
INSTALL TRAIN ORDER SIGNAL EAST END OF YARD AT BALL ST. |
Feb 15/26 |
|
|
Mar 6/26 |
3162 |
BRIDGEBURG |
WIRING CAR DEPARTMENT MACHINE SHOP & BLACKSMITH SHOP |
Jun 16/26 |
$65.63 |
|
Apr 19/26 |
3208 |
ST.THOMAS TO RIDGETOWN |
RECONSTRUCTION POLE LINE AND REPLACING ONE #10 COPPER WIRE WITH #9 COPPER WIRE |
May 14/27 |
$7950.00 |
|
May 5/26 |
3236 |
FARGO |
REPLACE WIRE-CONNECTED MECHANICALLY OPERATED SIGNALS TO PIPE CONNECTED SIGNALS CHANGING THE PRESENT SIGNALS TO TOP OF MAST MECHANISM ADDING CALLING ON SIGNAL TO WESTBOUND HOME INTERLOCKING SIGNAL AND RAISING THE LEAD-OUT TO MEET THE NEED GRADED TRACK |
Oct 7/26 |
$7050.00 |
|
May 22/26 |
3259 |
LASALETTE |
EXTENSION OF WESTBOUND ANNUNCIATOR |
Jun 3/26 |
$125.13 |
|
May 27/26 |
3260 |
LONDON |
MOVE TROLLEY POLE AND WIRE AT ENGINE HOUSE TRACK ( WORK PERFORMED BY L&PS ) |
Sep 2/26 |
$280.00 |
|
Jun 12/26 |
3276 |
MONTROSE |
STOCK YARDS - REMOVE LIGHTING MATERIAL ACCOUNT OF REMOVAL OF 14 PENS IN STOCK YARD ( LEAVING 5 PENS IN USE ) |
Jul 15/26 |
|
|
Jun 28/26 |
3288 |
WATERFORD |
ELECTRIC LIGHTING CHANGES ON WATERFORD COAL ELEVATOR |
Sept 4/26 |
$190.55 |
|
Jul 6/26 |
3297 |
YARMOUTH |
CHANGE SIGNALS 16 & 17 ON THE MCRR TO 3-POSITION UPPER QUADRANT SIGNALS AND SIGNALS 2 & 3 TO UPPER QUADRANT |
Feb 12/27 |
$2570.00 |
|
Jul 17/26 |
3308 |
WEST LORNE |
MOVE WESTBOUND TAKE SIDING SIGNAL FROM SIGNAL 1391 EAST TO SIGNAL 1381 |
Jul 20/26 |
$256.71 |
|
Jul 22/26 |
3316 |
WINDSOR |
ELECTRICAL WORK ON ACCOUNT OF BUILDING 9 ADDITIONAL STALLS AND EXTENDING BOILER HOUSE AND ENGINE HOUSE |
May 21/27 |
|
|
Sep 11/26 |
3362 |
WATERFORD |
INSTALL 3 COLOUR LIGHT SIGNAL ON THE MAST OF THE PRESENT TRAIN ORDER SIGNAL TO REPEAT THE INDICATION OF THE EASTBOUND SIGNAL. THIS SIGNAL IS TO BE LOCATED AT A HEIGHT SO THAT IT CAN BEST BE OBSERVED BY THE ENGINEMAN OF EASTBOUND PASSENGER TRAINS WHEN THEY ARE WEST OF THE NEW COAL CHUTE. |
Oct 19/26 |
|
|
Sep 30/26 |
3374 |
WATERFORD |
MOVE 20 HP MOTOR ON WATER PUMP FROM PRESENT PUMP HOUSE TO NEW LOCATION NORTH OF DEPOT |
Apr 25/27 |
$790.00 |
|
Oct 4/26 |
3379 |
ESSEX |
MOVE DERAIL DWARF SIGNAL #4 AND BATTERY BOXES ACCOUNT OF EXTENSION OF ESSEX FARMERS LTD. INDUSTRIAL TRACK |
Nov 9/26 |
|
|
Nov 1/26 |
3419 |
CANADA DIVISION |
INSTALL LETTER "G" ON AUTOMATIC SIGNALS FOR GRADE SIGNAL INDICATION TO BE INSTALLED 6' BELOW THE LOWER ARM. LOCATIONS: EASTBOUND TRACK SIGNALS 1532, 1310, 1202 AND 1062. WESTBOUND TRACK SIGNALS 473, 493, 701 AND 1291 |
Dec 7/26 |
$10.00 each |
|
Nov 4/26 |
3418 |
ST. THOMAS |
INSTALL ELECTRIC LIGHTS AT STOCK YARDS |
Nov 10/26 |
$195.00 |
|
Nov 10/26 |
3438 |
ST. THOMAS |
INSTALL HAYES DERAIL ON THE LEAD TO THE SHOP TRACKS |
Dec 23/26 |
$52.00 |
|
Nov 17/26 |
3446 |
DUTTON |
MOVE CROSSOVER BETWEEN NORTH SIDING AND WESTBOUND MAIN 1600' EAST AND CHANGE TO A FACING POINT CROSSOVER |
Nov 25/26 |
$1172.00 |
|
Nov 19/26 |
3442 |
TILBURY |
INSTALL ELECTRIC LIGHTS IN PUMP HOUSE AND DWELLING OCCUPIED BY PUMPER |
Feb 21/27 |
$390.00 |
|
Nov 22/26 |
3452 |
NIAGARA FALLS |
INSTALL ELECTRIC LIGHTS ON NEW BRIDGE TO DETECT ALIENS FROM ENTERING US |
Mar 22/27 |
|
|
Dec 10/26 |
3462 & 3462A |
WELLAND |
TEMPORARY WIRE CROSSING OVER WELLAND CANAL AT THE DRAWBRIDGE ON ACCOUNT OF MAKING EAST CHANNEL DEEPER AND DREDGING NEW WEST CHANNEL INSTALL PERMANENT SIGNAL UNDERWATER CABLES ACROSS THE EAST & WEST CHANNEL OF WELLAND CANAL |
Jun 26/29 |
$50550.00 |
|
Jan 5/27 |
3469 |
WINDSOR |
INSTALL ELECTRIC LIGHTS OVER BENCH VISES IN WINDSOR ROUNDHOUSE |
Mar 5/27 |
$250.00 |
|
Jan 28/27 |
3485 |
NIAGARA FALLS |
INSTALL ELECTRIC LIGHTS IN WATCHMAN'S HOUSE - EAST END OF NIAGARA RIVER BRIDGE |
Jan 11/27 |
|
|
Mar 21/27 |
3518 |
WINDSOR |
INSTALL ELECTRIC LIGHTS IN TELEPHONE BOOTHS IN WINDSOR STATION |
CANCELLED MAR 26/27 |
|
|
Apr 28/27 |
3565 |
SOUTHWOLD |
RETIREMENT OF TRAIN ORDER SIGNALS |
May 10/27 |
-$204.00 |
|
Apr 28/27 |
3566 |
NIAGARA-ON-THE-LAKE |
RETIREMENT OF TRAIN ORDER SIGNALS |
May 15/27 |
-$204.00 |
|
May 4/27 |
3570 |
VICTORIA PARK |
DIVERSION OF MAIN TRACK - ACCOUNT PROPOSED NEW SUBWAY |
Oct 27 |
|
|
May 5/27 |
3573 |
ST. THOMAS |
ELECTRICAL CONNECTIONS FOR OXWELD RAILROAD SERVICE. OXWELD HAS CONSTRUCTED AT ITS EXPENSE AND ACETYLENE GENERATOR BUILDING AND PLANT AND REQUIRES CONNECTIONS TO THE GENERATOR BUILDING FOR ELECTRIC SERVICE |
Apr 6/27 |
$25.00 |
|
May 18/27 |
3583 |
TAYLOR |
CONNECTING UP OF THE AUTOMATIC BLOCK SIGNAL FOR SWITCH LEADING ON TO THE EAST END OF THE NORTH PASSING TRACK |
May 13/27 |
|
|
Jun 14/27 |
3598 |
LEAMINGTON |
INSTALLATION OF SWITCH CONNECTED DERAIL ON IMPERIAL TOBACCO TRACK. |
Jul 7/27 |
|
|
Jul 8/27 |
3620 |
WINDSOR |
INSTALL ELECTRICAL CONNECTIONS FOR COAL UNLOADER AND MOTOR DRIVEN PUMP. COAL UNLOADER FROM WEST DETROIT LOCOMOTIVE SHOPS BOILER ROOM |
Nov 15/27 |
|
|
Aug 11/27 |
3648 |
WINDSOR |
INSTALL LIGHTING FOR NEW 100' TURNTABLE REPLACING 85' TURNTABLE |
Nov 15/27 |
|
|
Sep 2/27 |
3665 |
STEVENSVILLE |
INSTALLATION OF TWO WIGWAG SIGNALS IN ADDITION TO PRESENT BELL AT VICTORIA AVE. |
Oct 26/27 |
$749.20 |
|
Sep 19/27 |
3677 |
ST. THOMAS |
INSTALLATION OF 3 POSITION COLOUR LIGHT SIGNAL EAST OF THE DEPOT TO REPLACE THE PRESENT AUTOMATIC BLOCK SIGNAL ON BRACKET MAST |
Dec 30/27 |
$917.10 |
|
Sep 21/27 |
3686 |
WINDSOR |
INSTALL ELECTRIC LIGHTS IN NEW BUILDING TO BE USED FOR STORING ARCH BRICK |
Nov 28/27 |
|
|
Nov 8/27 |
3741 |
CORNELL |
CONNECTING WITH THE AUTOMATIC BLOCK SIGNALING A TEMPORARY SWITCH LOCATED IN THE EASTBOUND MAIN TRACK NEAR MP 85. TEMPORARY TRACK IS TO BE USED IN CONNECTION WITH THE REBUILDING OF OTTER CREEK BRIDGE. |
Jul 7/28 |
|
|
Nov 10/27 |
3748 |
WINDSOR |
MOVING POLE LINE TO MAKE ROOM FOR CINDER TRACK |
Nov 25/27 |
|
|
Nov 17/27 |
3752 |
SHEDDEN |
REMOVAL OF CROSSOVER BETWEEN THE EXTENSION TO THE SPUR TRACK AND EASTBOUND MAIN. DURING 1926 THE SPUR TRACK WAS EXTENDED 960' AND THE CROSSOVER BETWEEN THE EASTBOUND MAIN AND THE SPUR TRACK INSTALLED FOR THE PURPOSE OF UNLOADING ROAD BUILDING MATERIAL FOR THE DUFFERIN CONSTRUCTION. ON MAY 14, 1927 - THE CROSSOVER WAS REMOVED AND THE SPUR EXTENSION WILL REMAIN. |
Nov 14/27 |
|
|
Nov 23/27 |
3757 |
CANFIELD JUNCTION |
INSTALLATION OF WIGWAG WITH CROSSING BELLS ONE ON EACH SIDE OF TRACK AT SIDE OF STREET - CROSSING 3 MILES EAST OF CANFIELD JUNCTION |
Dec 22/27 |
$966.00 |
|
Dec 14/27 |
3774 |
SHEDDEN |
RETIREMENT OF TRAIN ORDER SIGNAL |
Dec 23/27 |
-$204.00 |
|
Dec 16/27 |
3777 |
BROOKFIELD |
INSTALLATION OF WIGWAG SIGNALS AND BELLS - NEIDLES ROAD, BROOKFIELD |
Feb 5/28 |
$2969.08 |
|
Jan 23/28 |
3787 |
NIAGARA FALLS TO FRASER |
INSTALL COLOUR LIGHT SIGNALS - GENERAL RAILWAY SIGNAL CO. TYPE S TO REPLACE EXISTING SEMAPHORE SIGNALS - DISTANCE 5 MILES |
May 4/29 |
$9815.78 |
|
Feb 2/28 |
3791 |
LASALETTE |
INSTALLATION OF ELECTRIC LIGHTS |
May 5/28 |
$96.30 |
|
Feb 20/28 |
3800 |
WATERFORD |
INSTALLATION OF HIGHWAY CROSSING WIGWAG SIGNALS - ST. JAMES ST. WATERFORD |
May 8/28 |
$2850.26 |
|
Feb 29/28 |
3801 |
WINDSOR |
INSTALLATION OF INDUCTORS FOR TESTING TRAIN CONTROL EQUIPMENT ON ENGINES |
Mar 1/28 |
$110.00 |
|
Feb 29/28 |
3802 |
ST. THOMAS |
INSTALLATION OF INDUCTORS FOR TESTING TRAIN CONTROL EQUIPMENT ON ENGINES |
Apr 25/28 |
$160.00 |
|
Mar 5/28 |
3810 |
LONDON |
MOVING TROLLEY WIRE AND POLE - PASSENGER STATION AT LONDON HAS BEEN LEASED TO LAINGFORD & EDWARDS. MCR WILL MOVE TRACKS NEAR STATION |
May 5/28 |
$486.00 |
|
Apr 9/28 |
3821 |
NIAGARA FALLS TO MONTROSE |
RECONSTRUCT T&T POLE LINE FOR WESTERN UNION - REPLACE DAMAGED CROSSARM PINS AND INSULATORS |
May 23/29 |
$750.00 |
|
Apr 16/28 |
3828 |
VICTORIA |
INSTALLATION OF FLOODLIGHTS IN THE EASTBOUND CLASSIFICATION YARD AT VICTORIA WHICH IS WEST OF THOMPSON ROAD AND IS THE OLD TH&B YARD |
Aug 27/28 |
$1040.00 |
|
Apr 16/28 |
X-796 |
NIAGARA-ON-THE-LAKE |
RETIREMENT OF STATION |
|
|
|
Apr 27/28 |
3837 |
HAGERSVILLE |
CHANGE THE LOCATION OF EASTBOUND AUTOMATIC BLOCK SIGNALS #514 AND #542 |
Jun 21/28 |
$435.00 |
|
May 8/28 |
3846 |
SPRINGFIELD |
INSTALLATION OF HIGHWAY CROSSING WIGWAG SIGNALS - EAST ST. SPRINGFIELD - ALSO UPGRADE CIRCUIT FOR CROSSING BELLS AT HORNSBY ROAD |
May 31/28 |
$685.44 |
|
Jul 7/28 |
3892 |
WOODSLEE |
INSTALLATION OF HIGHWAY CROSSING BELLS & WIGWAG SIGNALS. MAIN ST. WOODSLEE |
Jul 25/28 |
$748.06 |
|
Jul 8/28 |
3896 |
MONTROSE |
INSTALLATION OF INDUCTORS FOR TESTING TRAIN CONTROL EQUIPMENT ON ENGINES |
Oct 2/28 |
$150.00 |
|
Jul 9/28 |
3883 |
WEST LORNE |
INSTALL WIRING FOR ELECTRICALLY OPERATED CENTRIFUGAL PUMP AT WEST LORNE PUMPING STATION |
Jul 17/29 |
|
|
Jul 11/28 |
3897 |
VICTORIA |
INSTALLATION OF INDUCTORS FOR TESTING TRAIN CONTROL EQUIPMENT ON ENGINES |
Oct 1/28 |
$50.00 |
|
Jul 23/28 |
3915 |
HAGERSVILLE |
INSTALLATION OF WESTBOUND PASSING TRACK - 1 MILE WEST OF HAGERSVILLE. WESTBOUND AUTOMATIC HOME BLOCK SIGNAL #563 TO BE MOVED EAST OF THE EAST SWITCH |
Aug 22/28 |
$1583.88 |
|
Jul 24/28 |
3914 |
FORKS CREEK |
INSTALLATION OF POWER AND LIGHTS FOR PUMPING STATION |
Jan 11/29 |
$1250.00 |
|
Jul 25/28 |
3911 |
WINDSOR |
INSTALL 500 WATT ANGLE REFLECTOR ON THE EASTBOUND HUMP AND WESTBOUND HUMP |
Sep 20/28 |
$200.00 |
|
Jul 25/28 |
3919 |
LEAMINGTON |
INSTALLATION OF SWITCH CONNECTED DERAIL. 2 NEW TRACKS TO BE INSTALLED - THE SWITCH OF THE SECOND TRACK IS LOCATED NEAR THE FOULING POINT FROM THE MAIN TRACK SO THAT THE SWITCH CONNECTED DERAIL CAN BE INSTALLED JUST AHEAD OF THIS SECOND SWITCH |
Aug 14/28 |
|
|
Aug 3/28 |
3930 |
AMHERSTBURG |
INSTALLATION OF SWITCH CONNECTED DERAIL AT BOARDER BREWERS & DISTILLERS INDUSTRIAL TRACK THE SWITCH TO BE LOCATED 400' NORTH OF THE CROSSING OF THE HYDRO-ELECTRIC COMPANY. |
Aug 25/28 |
|
|
Aug 7/28 |
3932-A |
TILBURY |
INSTALLATION OF HIGHWAY CROSSING WIGWAG SIGNALS AND BELLS AT PROVINCIAL HIGHWAY #2 -2.5 MILES EAST OF TILBURY |
Nov 24/28 |
$2490.57 |
|
Aug 7/28 |
3933-A |
TILLSONBURG |
INSTALLATION OF HIGHWAY CROSSING WIGWAG SIGNALS AND BELLS AT BROADWAY ST. .94 MILES WEST OF TILLSONBURG |
Nov 24/28 |
$2124.48 |
|
Aug 7/28 |
3935 |
MONTROSE |
INSTALLATION OF HIGHWAY CROSSING WIGWAG SIGNALS AND BELLS AT STONE RD - .13 MILES SOUTH OF MONTROSE JCT. |
Dec 3/28 |
$1421.02 |
|
Aug 8/28 |
3936 |
BRIDGEBURG |
INSTALLATION OF SWITCH CONNECTED DETAIL ON HORTON STEEL INDUSTRIAL SWITCH |
Sep 14/28 |
|
|
Aug 8/28 |
3941-A |
PERRY |
INSTALLATION OF HIGHWAY CROSSING WIGWAG SIGNALS AND BELLS AT WILFORD ROAD - 2.6 MILES EAST OF PERRY |
Nov 7/28 |
$1694.60 |
|
Aug 8/28 |
3942-A |
CANFIELD |
INSTALLATION OF HIGHWAY CROSSING WIGWAG SIGNALS AND BELLS AT TALBOT ROAD - 1.9 MILES WEST OF CANFIELD |
Dec 10/28 |
$1605.94 |
|
Aug 8/28 |
3943-A |
RUSCOMB |
INSTALLATION OF HIGHWAY CROSSING WIGWAG SIGNALS AND BELLS AT MIDDLE ROAD - RUSCOMB |
Aug 27/28 |
$2153.88 |
|
Aug 10/28 |
3944-A |
TOWNSEND CENTRE |
INSTALLATION OF HIGHWAY CROSSING WIGWAG SIGNALS AND BELLS AT TOWNSEND CENTRE |
Dec 15/28 |
$2928.50 |
|
Aug 11/28 |
3945-A |
BROWNSVILLE |
INSTALLATION OF HIGHWAY CROSSING WIGWAG SIGNALS AND BELLS AT CROSSING NEXT TO STATION - BROWNSVILLE |
Dec 31/28 |
$2211.35 |
|
Aug 11/28 |
3946-A |
YARMOUTH |
INSTALLATION OF HIGHWAY CROSSING WIGWAG SIGNALS AND BELLS AT BELMONT RD - 1.6 MILES EAST OF YARMOUTH |
Jan 24/29 |
$1031.36 |
|
Aug 16/28 |
3951 |
HAGERSVILLE |
INSTALL SWITCH CONNECTED HAYES DERAIL AT THE EAST END OF THE SOUTH PASSING TRACK |
Sep 18/25 |
$285.00 |
|
Sep 6/28 |
3979 |
WINDSOR |
INSTALL HALF INTERLOCKING PLANT - CROSSING OF THE MCRR SINGLE TRACK LEADING TO THE DOCK AND ELECTRIC RAILWAY COMPANYS TRACKS - FIELD AVE - WINDSOR |
Oct 19/28 |
|
|
Oct 1/28 |
4002 |
ST. THOMAS |
INSTALL WIGWAG SIGNALS IN ADDITION TO CURRENT BELL - PRINCESS ST. - ST. THOMAS |
Dec 6/28 |
$840.44 |
|
Oct 10/28 |
4005 |
TILBURY |
INSTALL SWITCH-CONNECTED DERAIL AND CONNECT WITH AUTOMATIC BLOCK SIGNALS - NEW INDUSTRIAL SWITCH OFF EASTBOUND MAIN FOR THE CANADIAN TOP & BODY CORP. - TILBURY |
Nov 15/28 |
|
|
Oct 10/28 |
4014 |
TILBURY |
INSTALL DERAIL AND CONNECT WITH AUTOMATIC BLOCK SIGNALS - NEW INDUSTRIAL SWITCH OFF WESTBOUND MAIN FOR THE CANADIAN TOP & BODY CORP. - TILBURY |
Nov 8/28 |
|
|
Nov 1/28 |
4042 |
ST. THOMAS |
INSTALL FOUR 60 WATT LAMPS IN SAND HOUSE NEAR COAL ELEVATOR |
Oct 30/28 |
|
|
Nov 28/28 |
4083 |
NIAGARA FALLS |
INSTALL SWITCH CONNECTED DERAIL FOR NEW INDUSTRIAL TRACK TO SERVE PENINSULAR DISTILLING CO. |
Dec 11/28 |
|
|
Dec 3/28 |
4077 |
ST. THOMAS |
MOVE CROSSOVER FROM #1 TRACK ST.THOMAS YARD TO EASTBOUND MAIN TRACK 100' EAST |
Nov 2/28 |
|
|
Dec 4/28 |
4085 |
VICTORIA |
ELECTRICAL CONNECTIONS FOR NEW 100' TURNTABLE AT VICTORIA ROUNDHOUSE |
Dec 11/28 |
|
|
Dec 5/28 |
4044 |
PERRY |
NORTH SIDING AT PERRY IS TO BE EXTENDED 1900' EAST |
Nov 3/28 |
|
|
Dec 5/28 |
4086 |
PERRY |
SOUTH SIDING AT PERRY IS TO BE EXTENDED 1900' EAST |
Nov 1/28 |
|
|
Dec 5/28 |
4087 |
TILBURY |
NORTH SIDING AT TILBURY IS TO BE EXTENDED 1300' EAST |
Nov 13/28 |
|
|
Dec 5/28 |
4088 |
WATERFORD |
SOUTH SIDING AT WATERFORD IS TO BE EXTENDED 2200' WEST |
Nov 10/28 |
|
|
Dec 5/28 |
4089 |
WELLAND |
NORTH SIDING AT WELLAND TO BE EXTENDED 1900' WEST |
Nov 1/28 |
|
|
Dec 6/28 |
4045 |
TILLSONBURG |
SOUTH SIDING AT TILLSONBURG IS TO BE EXTENDED 1500' EAST |
Nov 6/28 |
|
|
Dec 6/28 |
4054 |
TILLSONBURG |
NORTH SIDING AT TILLSONBURG IS TO BE EXTENDED 2400' EAST |
Nov 30/28 |
|
|
Dec 28/28 |
4104 |
WELLAND |
INSTALLATION OF 2 35' POLES AND 200 WATT LAMPS ON PLATFORM EXTENSION |
Jan 4/29 |
$200.00 |
|
Jan 10/29 |
4130 |
TILBURY |
INSTALLATION OF HIGHWAY CROSSING WIGWAG SIGNALS AND BELLS AT TILBURY ST - TILBURY |
|
$1875.00 |
|
Jan 10/29 |
4131 |
TILBURY |
INSTALLATION OF HIGHWAY CROSSING WIGWAG SIGNALS AND BELLS AT QUEEN ST - TILBURY |
|
$1591.20 |
|
Jan 10/29 |
4132-A |
TAYLOR |
INSTALLATION OF HIGHWAY CROSSING WIGWAG SIGNALS AND BELLS AT BLAKES RD - 1.11 MILES EAST OF TAYLOR |
|
$1604.92 |
|
Jan 10/29 |
4133-A |
CHARING CROSS |
INSTALLATION OF HIGHWAY CROSSING WIGWAG SIGNALS AND BELLS AT WHITES CROSSING - CHARING CROSS |
Aug 22/29 |
$1637.63 |
|
Jan 10/29 |
4134-A |
TAYLOR |
INSTALLATION OF HIGHWAY CROSSING WIGWAG SIGNALS AND BELLS AT TOWN LINE RD - .5 MILES WEST OF TAYLOR |
Apr 10/29 |
$2126.87 |
|
Jan 10/29 |
4135-A |
HIGHGATE |
INSTALLATION OF HIGHWAY CROSSING WIGWAG SIGNALS AND BELLS AT TOWN LINE RD - 2.42 MILES WEST OF HIGHGATE |
Apr 23/29 |
$1946.42 |
|
Jan 10/29 |
4136-A |
FARGO |
INSTALLATION OF HIGHWAY CROSSING WIGWAG SIGNALS AND BELLS AT COMMUNICATION ROAD - .89 MILES EAST OF FARGO |
Apr 30/29 |
$1974.68 |
|
Jan 10/29 |
4137-A |
WEST LORNE |
INSTALLATION OF HIGHWAY CROSSING WIGWAG SIGNALS AND BELLS AT CONCESSION RD - .75 MILES EAST OF WEST LORNE |
|
$2032.00 |
|
Jan 10/29 |
4138-A |
VILLA NOVA |
INSTALLATION OF HIGHWAY CROSSING WIGWAG SIGNALS AND BELLS AT E.QUARTER LINE ROAD EAT OF STATION - VILLA NOVA |
Feb 27/29 |
$1927.81 |
|
Jan 10/29 |
4139-A |
DUFFERIN |
INSTALLATION OF HIGHWAY CROSSING WIGWAG SIGNALS AND BELLS AT DUFFERIN ROAD - WEST OF STATION AT DUFFERIN |
Aug 20/29 |
$1842.82 |
|
Jan 10/29 |
4140-A |
WELLAND |
INSTALLATION OF HIGHWAY CROSSING WIGWAG SIGNALS AND BELLS AT PROVINCIAL HIGHWAY - 2.73 MILES EAST OF WELLAND |
Feb 5/29 |
$1651.83 |
|
Feb 19/29 |
4157 |
MONTROSE |
REMOVAL OF ELECTRIC FACILITIES AT MONTROSE ICE PLATFORM ( TO BE REMOVED) |
|
|
|
Mar 1/29 |
4159 |
HAGERSVILLE |
INSTALL WIGWAG SIGNALS AND BELLS - TUSCORORA ST. - HAGERSVILLE |
Mar 15/29 |
$1971.04 |
|
Mar 1/29 |
4160 |
ST. THOMAS |
INSTALL NINE 500 WATT INDIRECT LIGHTING FIXTURES TO REPLACE 24 60 WATT DROP LIGHTS IN APPRENTICE SCHOOL ROOM |
Apr 12/29 |
$375.00 |
|
Mar 7/29 |
4161 |
ST. THOMAS |
INSTALL ELECTRIC LIGHTS AT ST. THOMAS STORE HOUSE FOR CANADA CUSTOMS |
Feb 21/29 |
|
|
Mar 8/29 |
4165 |
TOWNSEND CENTRE |
INSTALL WIGWAG SIGNALS IN ADDITION TO CURRENT BELL - 9TH CONCESSION ROAD - TOWNSEND CENTRE |
Mar 6/29 |
|
|
Mar 16/29 |
4170 |
ST. THOMAS |
INSTALL WIGWAG SIGNALS IN ADDITION TO CURRENT BELL - HINKS ST. - ST. THOMAS |
Mar 20/29 |
|
|
Apr 8/29 |
4188 |
BLACK CREEK |
REMOVE TRAIN ORDER SIGNAL - AGENCY STATION CLOSED IN 1927 - STATION RECENTLY REMOVED |
May 17/29 |
$50.00 |
|
Apr 8/29 |
4190 |
WEST LORNE |
EASTBOUND PASSING SIDING AT WEST LORNE IS TO BE EXTENDED 1658' WEST |
May 15/29 |
$165.57 |
|
Apr 8/29 |
4191 |
WEST LORNE |
WESTBOUND PASSING SIDING AT WEST LORNE IS TO BE EXTENDED 2134' EAST - SIGNAL #1391 IS TO BE MOVED 1450' EAST |
Apr 4/29 |
$1146.24 |
|
Apr 8/29 |
4192 |
TILBURY |
EASTBOUND PASSING SIDING AT TILBURY IS TO BE EXTENDED 973' EAST |
Sep 10/29 |
$494.40 |
|
Apr 8/29 |
4193 |
LASALETTE |
EASTBOUND PASSING SIDING AT LASALETTE IS TO BE EXTENDED 2190' EAST |
May 2/29 |
$290.00 |
|
Apr 30/29 |
4212 |
ST. THOMAS |
SIGNAL WORK IN CONNECTION WITH TEMPORARY TRACKS FOR THE RECONSTRUCTION OF KETTLE CREEK VIADUCT |
Aug 14/30 |
|
|
May 16/29 |
4223 |
NIAGARA FALLS |
INSTALLATION OF LIGHTNING FLASHLIGHT SIGNALS AT SIMCOE ST. & ONTARIO AVE. - NIAGARA FALLS |
Jul 31/29 |
$2175.90 |
|
May 16/29 |
4224 |
NIAGARA FALLS |
INSTALLATION OF LIGHTNING FLASHLIGHT SIGNALS AT EASTWOOD AVE. - NIAGARA FALLS |
Jul 31/29 |
$2140.32 |
|
May 16/29 |
4225 |
NIAGARA FALLS |
INSTALLATION OF LIGHTNING FLASHLIGHT SIGNALS AT CLIFTON HILL STREET - NIAGARA FALLS |
Jul 29/29 |
$1752.16 |
|
May 16/29 |
4226 |
NIAGARA FALLS |
INSTALLATION OF LIGHTNING FLASHLIGHT SIGNALS AT MORRISON STREET - NIAGARA FALLS |
Jul 31/29 |
$1581.08 |
|
May 16/29 |
4227 |
NIAGARA FALLS |
INSTALLATION OF LIGHTNING FLASHLIGHT SIGNALS AT HURON & ERIE STREETS - NIAGARA FALLS |
Jul 31/29 |
$2282.33 |
|
May 21/29 |
4230-A |
MONTROSE |
INSTALLATION OF MORRISON LIGHTNING FLASHLIGHT SIGNALS AT STANLEY ST. - MONTROSE |
Jul 30/29 |
$1535.98 |
|
May 21/29 |
4231-A |
FRASER |
< |