CASO Construction Orders ( Signal Department )
DATE OF ORDER |
ORDER # |
LOCATION |
WORK DESCRIPTION |
DATE COMPLETED |
NET COST (OF SIGNAL DEPT WORK ONLY) |
Feb 25/25 |
2819 |
NIAGARA RIVER |
CHANGING THE EASTBOUND AUTOMATIC BLOCK SIGNALING AND INSTALLATION OF ADDITIONAL SIGNALING ACCOUNT OF NEW BRIDGE |
Aug 28/26 |
|
Aug 11/25 |
2958 |
RIDGETOWN TO WINDSOR TOWER #4 |
RECONSTRUCTION OF ELECTRIC LINE BETWEEN RIDGETOWN AND WINDSOR TOWER #4 |
Jun 12/26 |
|
Sep 1/25 |
2934 |
WINDSOR |
WESTBOUND CLASSIFICATION YARD - INSTALL ELECTRICAL CONNECTIONS FOR AIR BRAKE TESTING FACILITIES |
Jan 4/26 |
$11,080.00 |
Sep 15/25 |
3009 |
HAGERSVILLE |
REPLACE 3 WIRE CONNECTED DWARF SIGNALS WITH ELECTRIC COLOUR LIGHT SIGNALS AND SLOTTED #7 WITH TOP POST MECHANISM |
Apr 25/26 |
|
Nov 15/25 |
3056 |
TILBURY |
REPLACE GASOLINE PUMP IN PUMPING STATION WITH ELECTRICALLY DRIVEN PUMP |
Sep 5/26 |
|
Dec 5/25 |
3064 |
WELLAND |
INSTALL UNDERWATER CABLE FOR TH&B AT WELLAND DRAWBRIDGE |
Jul 20/28 |
|
Dec 9/25 |
3075 |
WATERFORD |
INSTALL ELECTRIC LIGHTS IN PUMP HOUSE AND TRACK TANK BOILER HOUSE |
Apr 19/26 |
$180.00 |
Feb 3/26 |
3118 |
WELLAND |
INSTALL AUTOMATIC STARTER IN PUMPING PLANT |
Jun 10/26 |
|
Feb 6/26 |
3124 |
TILLSONBURG |
CONNECT MOTOR TO OPERATE CENTRIFUGAL PUMP |
Nov 4/26 |
|
Feb 19/26 |
3136 |
NIAGARA RIVER |
INSTALL ELECTRIC LIGHTS IN 9' X 14' BUILDING AT WEST END OF NIAGARA RIVER BRIDGE |
Mar 4/26 |
|
Mar 4/26 |
3157 |
ST. THOMAS |
INSTALL TRAIN ORDER SIGNAL EAST END OF YARD AT BALL ST. |
Feb 15/26 |
|
Mar 6/26 |
3162 |
BRIDGEBURG |
WIRING CAR DEPARTMENT MACHINE SHOP & BLACKSMITH SHOP |
Jun 16/26 |
$65.63 |
Apr 19/26 |
3208 |
ST.THOMAS TO RIDGETOWN |
RECONSTRUCTION POLE LINE AND REPLACING ONE #10 COPPER WIRE WITH #9 COPPER WIRE |
May 14/27 |
$7950.00 |
May 5/26 |
3236 |
FARGO |
REPLACE WIRE-CONNECTED MECHANICALLY OPERATED SIGNALS TO PIPE CONNECTED SIGNALS CHANGING THE PRESENT SIGNALS TO TOP OF MAST MECHANISM ADDING CALLING ON SIGNAL TO WESTBOUND HOME INTERLOCKING SIGNAL AND RAISING THE LEAD-OUT TO MEET THE NEED GRADED TRACK |
Oct 7/26 |
$7050.00 |
May 22/26 |
3259 |
LASALETTE |
EXTENSION OF WESTBOUND ANNUNCIATOR |
Jun 3/26 |
$125.13 |
May 27/26 |
3260 |
LONDON |
MOVE TROLLEY POLE AND WIRE AT ENGINE HOUSE TRACK ( WORK PERFORMED BY L&PS ) |
Sep 2/26 |
$280.00 |
Jun 12/26 |
3276 |
MONTROSE |
STOCK YARDS - REMOVE LIGHTING MATERIAL ACCOUNT OF REMOVAL OF 14 PENS IN STOCK YARD ( LEAVING 5 PENS IN USE ) |
Jul 15/26 |
|
Jun 28/26 |
3288 |
WATERFORD |
ELECTRIC LIGHTING CHANGES ON WATERFORD COAL ELEVATOR |
Sept 4/26 |
$190.55 |
Jul 6/26 |
3297 |
YARMOUTH |
CHANGE SIGNALS 16 & 17 ON THE MCRR TO 3-POSITION UPPER QUADRANT SIGNALS AND SIGNALS 2 & 3 TO UPPER QUADRANT |
Feb 12/27 |
$2570.00 |
Jul 17/26 |
3308 |
WEST LORNE |
MOVE WESTBOUND TAKE SIDING SIGNAL FROM SIGNAL 1391 EAST TO SIGNAL 1381 |
Jul 20/26 |
$256.71 |
Jul 22/26 |
3316 |
WINDSOR |
ELECTRICAL WORK ON ACCOUNT OF BUILDING 9 ADDITIONAL STALLS AND EXTENDING BOILER HOUSE AND ENGINE HOUSE |
May 21/27 |
|
Sep 11/26 |
3362 |
WATERFORD |
INSTALL 3 COLOUR LIGHT SIGNAL ON THE MAST OF THE PRESENT TRAIN ORDER SIGNAL TO REPEAT THE INDICATION OF THE EASTBOUND SIGNAL. THIS SIGNAL IS TO BE LOCATED AT A HEIGHT SO THAT IT CAN BEST BE OBSERVED BY THE ENGINEMAN OF EASTBOUND PASSENGER TRAINS WHEN THEY ARE WEST OF THE NEW COAL CHUTE. |
Oct 19/26 |
|
Sep 30/26 |
3374 |
WATERFORD |
MOVE 20 HP MOTOR ON WATER PUMP FROM PRESENT PUMP HOUSE TO NEW LOCATION NORTH OF DEPOT |
Apr 25/27 |
$790.00 |
Oct 4/26 |
3379 |
ESSEX |
MOVE DERAIL DWARF SIGNAL #4 AND BATTERY BOXES ACCOUNT OF EXTENSION OF ESSEX FARMERS LTD. INDUSTRIAL TRACK |
Nov 9/26 |
|
Nov 1/26 |
3419 |
CANADA DIVISION |
INSTALL LETTER "G" ON AUTOMATIC SIGNALS FOR GRADE SIGNAL INDICATION TO BE INSTALLED 6' BELOW THE LOWER ARM. LOCATIONS: EASTBOUND TRACK SIGNALS 1532, 1310, 1202 AND 1062. WESTBOUND TRACK SIGNALS 473, 493, 701 AND 1291 |
Dec 7/26 |
$10.00 each |
Nov 4/26 |
3418 |
ST. THOMAS |
INSTALL ELECTRIC LIGHTS AT STOCK YARDS |
Nov 10/26 |
$195.00 |
Nov 10/26 |
3438 |
ST. THOMAS |
INSTALL HAYES DERAIL ON THE LEAD TO THE SHOP TRACKS |
Dec 23/26 |
$52.00 |
Nov 17/26 |
3446 |
DUTTON |
MOVE CROSSOVER BETWEEN NORTH SIDING AND WESTBOUND MAIN 1600' EAST AND CHANGE TO A FACING POINT CROSSOVER |
Nov 25/26 |
$1172.00 |
Nov 19/26 |
3442 |
TILBURY |
INSTALL ELECTRIC LIGHTS IN PUMP HOUSE AND DWELLING OCCUPIED BY PUMPER |
Feb 21/27 |
$390.00 |
Nov 22/26 |
3452 |
NIAGARA FALLS |
INSTALL ELECTRIC LIGHTS ON NEW BRIDGE TO DETECT ALIENS FROM ENTERING US |
Mar 22/27 |
|
Dec 10/26 |
3462 & 3462A |
WELLAND |
TEMPORARY WIRE CROSSING OVER WELLAND CANAL AT THE DRAWBRIDGE ON ACCOUNT OF MAKING EAST CHANNEL DEEPER AND DREDGING NEW WEST CHANNEL INSTALL PERMANENT SIGNAL UNDERWATER CABLES ACROSS THE EAST & WEST CHANNEL OF WELLAND CANAL |
Jun 26/29 |
$50550.00 |
Jan 5/27 |
3469 |
WINDSOR |
INSTALL ELECTRIC LIGHTS OVER BENCH VISES IN WINDSOR ROUNDHOUSE |
Mar 5/27 |
$250.00 |
Jan 28/27 |
3485 |
NIAGARA FALLS |
INSTALL ELECTRIC LIGHTS IN WATCHMAN'S HOUSE - EAST END OF NIAGARA RIVER BRIDGE |
Jan 11/27 |
|
Mar 21/27 |
3518 |
WINDSOR |
INSTALL ELECTRIC LIGHTS IN TELEPHONE BOOTHS IN WINDSOR STATION |
CANCELLED MAR 26/27 |
|
Apr 28/27 |
3565 |
SOUTHWOLD |
RETIREMENT OF TRAIN ORDER SIGNALS |
May 10/27 |
-$204.00 |
Apr 28/27 |
3566 |
NIAGARA-ON-THE-LAKE |
RETIREMENT OF TRAIN ORDER SIGNALS |
May 15/27 |
-$204.00 |
May 4/27 |
3570 |
VICTORIA PARK |
DIVERSION OF MAIN TRACK - ACCOUNT PROPOSED NEW SUBWAY |
Oct 27 |
|
May 5/27 |
3573 |
ST. THOMAS |
ELECTRICAL CONNECTIONS FOR OXWELD RAILROAD SERVICE. OXWELD HAS CONSTRUCTED AT ITS EXPENSE AND ACETYLENE GENERATOR BUILDING AND PLANT AND REQUIRES CONNECTIONS TO THE GENERATOR BUILDING FOR ELECTRIC SERVICE |
Apr 6/27 |
$25.00 |
May 18/27 |
3583 |
TAYLOR |
CONNECTING UP OF THE AUTOMATIC BLOCK SIGNAL FOR SWITCH LEADING ON TO THE EAST END OF THE NORTH PASSING TRACK |
May 13/27 |
|
Jun 14/27 |
3598 |
LEAMINGTON |
INSTALLATION OF SWITCH CONNECTED DERAIL ON IMPERIAL TOBACCO TRACK. |
Jul 7/27 |
|
Jul 8/27 |
3620 |
WINDSOR |
INSTALL ELECTRICAL CONNECTIONS FOR COAL UNLOADER AND MOTOR DRIVEN PUMP. COAL UNLOADER FROM WEST DETROIT LOCOMOTIVE SHOPS BOILER ROOM |
Nov 15/27 |
|
Aug 11/27 |
3648 |
WINDSOR |
INSTALL LIGHTING FOR NEW 100' TURNTABLE REPLACING 85' TURNTABLE |
Nov 15/27 |
|
Sep 2/27 |
3665 |
STEVENSVILLE |
INSTALLATION OF TWO WIGWAG SIGNALS IN ADDITION TO PRESENT BELL AT VICTORIA AVE. |
Oct 26/27 |
$749.20 |
Sep 19/27 |
3677 |
ST. THOMAS |
INSTALLATION OF 3 POSITION COLOUR LIGHT SIGNAL EAST OF THE DEPOT TO REPLACE THE PRESENT AUTOMATIC BLOCK SIGNAL ON BRACKET MAST |
Dec 30/27 |
$917.10 |
Sep 21/27 |
3686 |
WINDSOR |
INSTALL ELECTRIC LIGHTS IN NEW BUILDING TO BE USED FOR STORING ARCH BRICK |
Nov 28/27 |
|
Nov 8/27 |
3741 |
CORNELL |
CONNECTING WITH THE AUTOMATIC BLOCK SIGNALING A TEMPORARY SWITCH LOCATED IN THE EASTBOUND MAIN TRACK NEAR MP 85. TEMPORARY TRACK IS TO BE USED IN CONNECTION WITH THE REBUILDING OF OTTER CREEK BRIDGE. |
Jul 7/28 |
|
Nov 10/27 |
3748 |
WINDSOR |
MOVING POLE LINE TO MAKE ROOM FOR CINDER TRACK |
Nov 25/27 |
|
Nov 17/27 |
3752 |
SHEDDEN |
REMOVAL OF CROSSOVER BETWEEN THE EXTENSION TO THE SPUR TRACK AND EASTBOUND MAIN. DURING 1926 THE SPUR TRACK WAS EXTENDED 960' AND THE CROSSOVER BETWEEN THE EASTBOUND MAIN AND THE SPUR TRACK INSTALLED FOR THE PURPOSE OF UNLOADING ROAD BUILDING MATERIAL FOR THE DUFFERIN CONSTRUCTION. ON MAY 14, 1927 - THE CROSSOVER WAS REMOVED AND THE SPUR EXTENSION WILL REMAIN. |
Nov 14/27 |
|
Nov 23/27 |
3757 |
CANFIELD JUNCTION |
INSTALLATION OF WIGWAG WITH CROSSING BELLS ONE ON EACH SIDE OF TRACK AT SIDE OF STREET - CROSSING 3 MILES EAST OF CANFIELD JUNCTION |
Dec 22/27 |
$966.00 |
Dec 14/27 |
3774 |
SHEDDEN |
RETIREMENT OF TRAIN ORDER SIGNAL |
Dec 23/27 |
-$204.00 |
Dec 16/27 |
3777 |
BROOKFIELD |
INSTALLATION OF WIGWAG SIGNALS AND BELLS - NEIDLES ROAD, BROOKFIELD |
Feb 5/28 |
$2969.08 |
Jan 23/28 |
3787 |
NIAGARA FALLS TO FRASER |
INSTALL COLOUR LIGHT SIGNALS - GENERAL RAILWAY SIGNAL CO. TYPE S TO REPLACE EXISTING SEMAPHORE SIGNALS - DISTANCE 5 MILES |
May 4/29 |
$9815.78 |
Feb 2/28 |
3791 |
LASALETTE |
INSTALLATION OF ELECTRIC LIGHTS |
May 5/28 |
$96.30 |
Feb 20/28 |
3800 |
WATERFORD |
INSTALLATION OF HIGHWAY CROSSING WIGWAG SIGNALS - ST. JAMES ST. WATERFORD |
May 8/28 |
$2850.26 |
Feb 29/28 |
3801 |
WINDSOR |
INSTALLATION OF INDUCTORS FOR TESTING TRAIN CONTROL EQUIPMENT ON ENGINES |
Mar 1/28 |
$110.00 |
Feb 29/28 |
3802 |
ST. THOMAS |
INSTALLATION OF INDUCTORS FOR TESTING TRAIN CONTROL EQUIPMENT ON ENGINES |
Apr 25/28 |
$160.00 |
Mar 5/28 |
3810 |
LONDON |
MOVING TROLLEY WIRE AND POLE - PASSENGER STATION AT LONDON HAS BEEN LEASED TO LAINGFORD & EDWARDS. MCR WILL MOVE TRACKS NEAR STATION |
May 5/28 |
$486.00 |
Apr 9/28 |
3821 |
NIAGARA FALLS TO MONTROSE |
RECONSTRUCT T&T POLE LINE FOR WESTERN UNION - REPLACE DAMAGED CROSSARM PINS AND INSULATORS |
May 23/29 |
$750.00 |
Apr 16/28 |
3828 |
VICTORIA |
INSTALLATION OF FLOODLIGHTS IN THE EASTBOUND CLASSIFICATION YARD AT VICTORIA WHICH IS WEST OF THOMPSON ROAD AND IS THE OLD TH&B YARD |
Aug 27/28 |
$1040.00 |
Apr 16/28 |
X-796 |
NIAGARA-ON-THE-LAKE |
RETIREMENT OF STATION |
|
|
Apr 27/28 |
3837 |
HAGERSVILLE |
CHANGE THE LOCATION OF EASTBOUND AUTOMATIC BLOCK SIGNALS #514 AND #542 |
Jun 21/28 |
$435.00 |
May 8/28 |
3846 |
SPRINGFIELD |
INSTALLATION OF HIGHWAY CROSSING WIGWAG SIGNALS - EAST ST. SPRINGFIELD - ALSO UPGRADE CIRCUIT FOR CROSSING BELLS AT HORNSBY ROAD |
May 31/28 |
$685.44 |
Jul 7/28 |
3892 |
WOODSLEE |
INSTALLATION OF HIGHWAY CROSSING BELLS & WIGWAG SIGNALS. MAIN ST. WOODSLEE |
Jul 25/28 |
$748.06 |
Jul 8/28 |
3896 |
MONTROSE |
INSTALLATION OF INDUCTORS FOR TESTING TRAIN CONTROL EQUIPMENT ON ENGINES |
Oct 2/28 |
$150.00 |
Jul 9/28 |
3883 |
WEST LORNE |
INSTALL WIRING FOR ELECTRICALLY OPERATED CENTRIFUGAL PUMP AT WEST LORNE PUMPING STATION |
Jul 17/29 |
|
Jul 11/28 |
3897 |
VICTORIA |
INSTALLATION OF INDUCTORS FOR TESTING TRAIN CONTROL EQUIPMENT ON ENGINES |
Oct 1/28 |
$50.00 |
Jul 23/28 |
3915 |
HAGERSVILLE |
INSTALLATION OF WESTBOUND PASSING TRACK - 1 MILE WEST OF HAGERSVILLE. WESTBOUND AUTOMATIC HOME BLOCK SIGNAL #563 TO BE MOVED EAST OF THE EAST SWITCH |
Aug 22/28 |
$1583.88 |
Jul 24/28 |
3914 |
FORKS CREEK |
INSTALLATION OF POWER AND LIGHTS FOR PUMPING STATION |
Jan 11/29 |
$1250.00 |
Jul 25/28 |
3911 |
WINDSOR |
INSTALL 500 WATT ANGLE REFLECTOR ON THE EASTBOUND HUMP AND WESTBOUND HUMP |
Sep 20/28 |
$200.00 |
Jul 25/28 |
3919 |
LEAMINGTON |
INSTALLATION OF SWITCH CONNECTED DERAIL. 2 NEW TRACKS TO BE INSTALLED - THE SWITCH OF THE SECOND TRACK IS LOCATED NEAR THE FOULING POINT FROM THE MAIN TRACK SO THAT THE SWITCH CONNECTED DERAIL CAN BE INSTALLED JUST AHEAD OF THIS SECOND SWITCH |
Aug 14/28 |
|
Aug 3/28 |
3930 |
AMHERSTBURG |
INSTALLATION OF SWITCH CONNECTED DERAIL AT BOARDER BREWERS & DISTILLERS INDUSTRIAL TRACK THE SWITCH TO BE LOCATED 400' NORTH OF THE CROSSING OF THE HYDRO-ELECTRIC COMPANY. |
Aug 25/28 |
|
Aug 7/28 |
3932-A |
TILBURY |
INSTALLATION OF HIGHWAY CROSSING WIGWAG SIGNALS AND BELLS AT PROVINCIAL HIGHWAY #2 -2.5 MILES EAST OF TILBURY |
Nov 24/28 |
$2490.57 |
Aug 7/28 |
3933-A |
TILLSONBURG |
INSTALLATION OF HIGHWAY CROSSING WIGWAG SIGNALS AND BELLS AT BROADWAY ST. .94 MILES WEST OF TILLSONBURG |
Nov 24/28 |
$2124.48 |
Aug 7/28 |
3935 |
MONTROSE |
INSTALLATION OF HIGHWAY CROSSING WIGWAG SIGNALS AND BELLS AT STONE RD - .13 MILES SOUTH OF MONTROSE JCT. |
Dec 3/28 |
$1421.02 |
Aug 8/28 |
3936 |
BRIDGEBURG |
INSTALLATION OF SWITCH CONNECTED DETAIL ON HORTON STEEL INDUSTRIAL SWITCH |
Sep 14/28 |
|
Aug 8/28 |
3941-A |
PERRY |
INSTALLATION OF HIGHWAY CROSSING WIGWAG SIGNALS AND BELLS AT WILFORD ROAD - 2.6 MILES EAST OF PERRY |
Nov 7/28 |
$1694.60 |
Aug 8/28 |
3942-A |
CANFIELD |
INSTALLATION OF HIGHWAY CROSSING WIGWAG SIGNALS AND BELLS AT TALBOT ROAD - 1.9 MILES WEST OF CANFIELD |
Dec 10/28 |
$1605.94 |
Aug 8/28 |
3943-A |
RUSCOMB |
INSTALLATION OF HIGHWAY CROSSING WIGWAG SIGNALS AND BELLS AT MIDDLE ROAD - RUSCOMB |
Aug 27/28 |
$2153.88 |
Aug 10/28 |
3944-A |
TOWNSEND CENTRE |
INSTALLATION OF HIGHWAY CROSSING WIGWAG SIGNALS AND BELLS AT TOWNSEND CENTRE |
Dec 15/28 |
$2928.50 |
Aug 11/28 |
3945-A |
BROWNSVILLE |
INSTALLATION OF HIGHWAY CROSSING WIGWAG SIGNALS AND BELLS AT CROSSING NEXT TO STATION - BROWNSVILLE |
Dec 31/28 |
$2211.35 |
Aug 11/28 |
3946-A |
YARMOUTH |
INSTALLATION OF HIGHWAY CROSSING WIGWAG SIGNALS AND BELLS AT BELMONT RD - 1.6 MILES EAST OF YARMOUTH |
Jan 24/29 |
$1031.36 |
Aug 16/28 |
3951 |
HAGERSVILLE |
INSTALL SWITCH CONNECTED HAYES DERAIL AT THE EAST END OF THE SOUTH PASSING TRACK |
Sep 18/25 |
$285.00 |
Sep 6/28 |
3979 |
WINDSOR |
INSTALL HALF INTERLOCKING PLANT - CROSSING OF THE MCRR SINGLE TRACK LEADING TO THE DOCK AND ELECTRIC RAILWAY COMPANYS TRACKS - FIELD AVE - WINDSOR |
Oct 19/28 |
|
Oct 1/28 |
4002 |
ST. THOMAS |
INSTALL WIGWAG SIGNALS IN ADDITION TO CURRENT BELL - PRINCESS ST. - ST. THOMAS |
Dec 6/28 |
$840.44 |
Oct 10/28 |
4005 |
TILBURY |
INSTALL SWITCH-CONNECTED DERAIL AND CONNECT WITH AUTOMATIC BLOCK SIGNALS - NEW INDUSTRIAL SWITCH OFF EASTBOUND MAIN FOR THE CANADIAN TOP & BODY CORP. - TILBURY |
Nov 15/28 |
|
Oct 10/28 |
4014 |
TILBURY |
INSTALL DERAIL AND CONNECT WITH AUTOMATIC BLOCK SIGNALS - NEW INDUSTRIAL SWITCH OFF WESTBOUND MAIN FOR THE CANADIAN TOP & BODY CORP. - TILBURY |
Nov 8/28 |
|
Nov 1/28 |
4042 |
ST. THOMAS |
INSTALL FOUR 60 WATT LAMPS IN SAND HOUSE NEAR COAL ELEVATOR |
Oct 30/28 |
|
Nov 28/28 |
4083 |
NIAGARA FALLS |
INSTALL SWITCH CONNECTED DERAIL FOR NEW INDUSTRIAL TRACK TO SERVE PENINSULAR DISTILLING CO. |
Dec 11/28 |
|
Dec 3/28 |
4077 |
ST. THOMAS |
MOVE CROSSOVER FROM #1 TRACK ST.THOMAS YARD TO EASTBOUND MAIN TRACK 100' EAST |
Nov 2/28 |
|
Dec 4/28 |
4085 |
VICTORIA |
ELECTRICAL CONNECTIONS FOR NEW 100' TURNTABLE AT VICTORIA ROUNDHOUSE |
Dec 11/28 |
|
Dec 5/28 |
4044 |
PERRY |
NORTH SIDING AT PERRY IS TO BE EXTENDED 1900' EAST |
Nov 3/28 |
|
Dec 5/28 |
4086 |
PERRY |
SOUTH SIDING AT PERRY IS TO BE EXTENDED 1900' EAST |
Nov 1/28 |
|
Dec 5/28 |
4087 |
TILBURY |
NORTH SIDING AT TILBURY IS TO BE EXTENDED 1300' EAST |
Nov 13/28 |
|
Dec 5/28 |
4088 |
WATERFORD |
SOUTH SIDING AT WATERFORD IS TO BE EXTENDED 2200' WEST |
Nov 10/28 |
|
Dec 5/28 |
4089 |
WELLAND |
NORTH SIDING AT WELLAND TO BE EXTENDED 1900' WEST |
Nov 1/28 |
|
Dec 6/28 |
4045 |
TILLSONBURG |
SOUTH SIDING AT TILLSONBURG IS TO BE EXTENDED 1500' EAST |
Nov 6/28 |
|
Dec 6/28 |
4054 |
TILLSONBURG |
NORTH SIDING AT TILLSONBURG IS TO BE EXTENDED 2400' EAST |
Nov 30/28 |
|
Dec 28/28 |
4104 |
WELLAND |
INSTALLATION OF 2 35' POLES AND 200 WATT LAMPS ON PLATFORM EXTENSION |
Jan 4/29 |
$200.00 |
Jan 10/29 |
4130 |
TILBURY |
INSTALLATION OF HIGHWAY CROSSING WIGWAG SIGNALS AND BELLS AT TILBURY ST - TILBURY |
|
$1875.00 |
Jan 10/29 |
4131 |
TILBURY |
INSTALLATION OF HIGHWAY CROSSING WIGWAG SIGNALS AND BELLS AT QUEEN ST - TILBURY |
|
$1591.20 |
Jan 10/29 |
4132-A |
TAYLOR |
INSTALLATION OF HIGHWAY CROSSING WIGWAG SIGNALS AND BELLS AT BLAKES RD - 1.11 MILES EAST OF TAYLOR |
|
$1604.92 |
Jan 10/29 |
4133-A |
CHARING CROSS |
INSTALLATION OF HIGHWAY CROSSING WIGWAG SIGNALS AND BELLS AT WHITES CROSSING - CHARING CROSS |
Aug 22/29 |
$1637.63 |
Jan 10/29 |
4134-A |
TAYLOR |
INSTALLATION OF HIGHWAY CROSSING WIGWAG SIGNALS AND BELLS AT TOWN LINE RD - .5 MILES WEST OF TAYLOR |
Apr 10/29 |
$2126.87 |
Jan 10/29 |
4135-A |
HIGHGATE |
INSTALLATION OF HIGHWAY CROSSING WIGWAG SIGNALS AND BELLS AT TOWN LINE RD - 2.42 MILES WEST OF HIGHGATE |
Apr 23/29 |
$1946.42 |
Jan 10/29 |
4136-A |
FARGO |
INSTALLATION OF HIGHWAY CROSSING WIGWAG SIGNALS AND BELLS AT COMMUNICATION ROAD - .89 MILES EAST OF FARGO |
Apr 30/29 |
$1974.68 |
Jan 10/29 |
4137-A |
WEST LORNE |
INSTALLATION OF HIGHWAY CROSSING WIGWAG SIGNALS AND BELLS AT CONCESSION RD - .75 MILES EAST OF WEST LORNE |
|
$2032.00 |
Jan 10/29 |
4138-A |
VILLA NOVA |
INSTALLATION OF HIGHWAY CROSSING WIGWAG SIGNALS AND BELLS AT E.QUARTER LINE ROAD EAT OF STATION - VILLA NOVA |
Feb 27/29 |
$1927.81 |
Jan 10/29 |
4139-A |
DUFFERIN |
INSTALLATION OF HIGHWAY CROSSING WIGWAG SIGNALS AND BELLS AT DUFFERIN ROAD - WEST OF STATION AT DUFFERIN |
Aug 20/29 |
$1842.82 |
Jan 10/29 |
4140-A |
WELLAND |
INSTALLATION OF HIGHWAY CROSSING WIGWAG SIGNALS AND BELLS AT PROVINCIAL HIGHWAY - 2.73 MILES EAST OF WELLAND |
Feb 5/29 |
$1651.83 |
Feb 19/29 |
4157 |
MONTROSE |
REMOVAL OF ELECTRIC FACILITIES AT MONTROSE ICE PLATFORM ( TO BE REMOVED) |
|
|
Mar 1/29 |
4159 |
HAGERSVILLE |
INSTALL WIGWAG SIGNALS AND BELLS - TUSCORORA ST. - HAGERSVILLE |
Mar 15/29 |
$1971.04 |
Mar 1/29 |
4160 |
ST. THOMAS |
INSTALL NINE 500 WATT INDIRECT LIGHTING FIXTURES TO REPLACE 24 60 WATT DROP LIGHTS IN APPRENTICE SCHOOL ROOM |
Apr 12/29 |
$375.00 |
Mar 7/29 |
4161 |
ST. THOMAS |
INSTALL ELECTRIC LIGHTS AT ST. THOMAS STORE HOUSE FOR CANADA CUSTOMS |
Feb 21/29 |
|
Mar 8/29 |
4165 |
TOWNSEND CENTRE |
INSTALL WIGWAG SIGNALS IN ADDITION TO CURRENT BELL - 9TH CONCESSION ROAD - TOWNSEND CENTRE |
Mar 6/29 |
|
Mar 16/29 |
4170 |
ST. THOMAS |
INSTALL WIGWAG SIGNALS IN ADDITION TO CURRENT BELL - HINKS ST. - ST. THOMAS |
Mar 20/29 |
|
Apr 8/29 |
4188 |
BLACK CREEK |
REMOVE TRAIN ORDER SIGNAL - AGENCY STATION CLOSED IN 1927 - STATION RECENTLY REMOVED |
May 17/29 |
$50.00 |
Apr 8/29 |
4190 |
WEST LORNE |
EASTBOUND PASSING SIDING AT WEST LORNE IS TO BE EXTENDED 1658' WEST |
May 15/29 |
$165.57 |
Apr 8/29 |
4191 |
WEST LORNE |
WESTBOUND PASSING SIDING AT WEST LORNE IS TO BE EXTENDED 2134' EAST - SIGNAL #1391 IS TO BE MOVED 1450' EAST |
Apr 4/29 |
$1146.24 |
Apr 8/29 |
4192 |
TILBURY |
EASTBOUND PASSING SIDING AT TILBURY IS TO BE EXTENDED 973' EAST |
Sep 10/29 |
$494.40 |
Apr 8/29 |
4193 |
LASALETTE |
EASTBOUND PASSING SIDING AT LASALETTE IS TO BE EXTENDED 2190' EAST |
May 2/29 |
$290.00 |
Apr 30/29 |
4212 |
ST. THOMAS |
SIGNAL WORK IN CONNECTION WITH TEMPORARY TRACKS FOR THE RECONSTRUCTION OF KETTLE CREEK VIADUCT |
Aug 14/30 |
|
May 16/29 |
4223 |
NIAGARA FALLS |
INSTALLATION OF LIGHTNING FLASHLIGHT SIGNALS AT SIMCOE ST. & ONTARIO AVE. - NIAGARA FALLS |
Jul 31/29 |
$2175.90 |
May 16/29 |
4224 |
NIAGARA FALLS |
INSTALLATION OF LIGHTNING FLASHLIGHT SIGNALS AT EASTWOOD AVE. - NIAGARA FALLS |
Jul 31/29 |
$2140.32 |
May 16/29 |
4225 |
NIAGARA FALLS |
INSTALLATION OF LIGHTNING FLASHLIGHT SIGNALS AT CLIFTON HILL STREET - NIAGARA FALLS |
Jul 29/29 |
$1752.16 |
May 16/29 |
4226 |
NIAGARA FALLS |
INSTALLATION OF LIGHTNING FLASHLIGHT SIGNALS AT MORRISON STREET - NIAGARA FALLS |
Jul 31/29 |
$1581.08 |
May 16/29 |
4227 |
NIAGARA FALLS |
INSTALLATION OF LIGHTNING FLASHLIGHT SIGNALS AT HURON & ERIE STREETS - NIAGARA FALLS |
Jul 31/29 |
$2282.33 |
May 21/29 |
4230-A |
MONTROSE |
INSTALLATION OF MORRISON LIGHTNING FLASHLIGHT SIGNALS AT STANLEY ST. - MONTROSE |
Jul 30/29 |
$1535.98 |
May 21/29 |
4231-A |
FRASER |
INSTALLATION OF MORRISON LIGHTNING FLASHLIGHT SIGNALS AT TOWN LINE RD. - FRASER |
Jul 31/29 |
$1649.23 |
May 21/29 |
4232-A |
ATTERCLIFFE |
INSTALLATION OF MORRISON LIGHTNING FLASHLIGHT SIGNALS AT CONCESSION ROAD - ATTERCLIFFE |
Aug 12/29 |
$1537.17 |
May 21/29 |
4233-A |
ATTERCLIFFE |
INSTALLATION OF MORRISON LIGHTNING FLASHLIGHT SIGNALS AT ROBINSON ROAD - ATTERCLIFFE |
Aug 12/29 |
$1979.65 |
May 21/29 |
4234-A |
ATTERCLIFFE |
INSTALLATION OF MORRISON LIGHTNING FLASHLIGHT SIGNALS AT YOUNG ST. - ATTERCLIFFE |
Aug 12/29 |
$1668.91 |
May 21/29 |
4235-A |
WATERFORD |
INSTALLATION OF MORRISON LIGHTNING FLASHLIGHT SIGNALS AT TOWN LINE RD. - WATERFORD |
Aug 17/29 |
$1675.11 |
May 21/29 |
4236-A |
RIDGETOWN |
INSTALLATION OF MORRISON LIGHTNING FLASHLIGHT SIGNALS AT THAMESVILLE ROAD - RIDGETOWN |
Aug 24/29 |
$1872.75 |
May 21/29 |
4237-A |
RIDGETOWN |
INSTALLATION OF MORRISON LIGHTNING FLASHLIGHT SIGNALS AT VICTORIA AVE. - RIDGETOWN |
Aug 24/29 |
$1369.84 |
May 21/29 |
4238-A |
RIDGETOWN |
INSTALLATION OF MORRISON LIGHTNING FLASHLIGHT SIGNALS AT SCANE RD. - RIDGETOWN |
Aug 31/29 |
$2402.72 |
May 21/29 |
4239-A |
RIDGETOWN |
INSTALLATION OF MORRISON LIGHTNING FLASHLIGHT SIGNALS AT TOWN LINE RD. - RIDGETOWN |
Sept 5/29 |
$1468.59 |
May 29/29 |
4250-A |
WELLAND |
INSTALLATION OF HIGHWAY WIGWAG SIGNALS AND BELLS AT ONTARIO ROAD - WELLAND |
Oct 21/29 |
$1588.45 |
Jun 15/29 |
4256 |
ST. THOMAS |
INSTALL FIVE 50 WATT LAMPS IN ADDITIONAL OFFICES FOR THE STORE DEPARTMENT |
Jun 6/29 |
|
Jun 27/29 |
4282 |
HAGERSVILLE |
REMOVE TRAIN ORDER SIGNAL - YELLOW LAMPS AND FLAGS HAVE BEEN INSTALLED |
Jun 24/29 |
$80.00 |
Jul 16/29 |
4299 |
KINGSMILL |
KINGSMILL HAS BEEN DISCONTINUED AS A TELEGRAPH OFFICE - REMOVE TRAIN ORDER SIGNAL |
Aug 24/29 |
$50.00 |
Jul 20/29 |
4303 |
CAYUGA |
INSTALL ELECTRICAL CONNECTIONS TO A 50 HP MOTOR AND INSTALL FOUR 200 WATT LAMPS AT CAYUGA PUMP HOUSE |
Jul 5/30 |
|
Sep 10/29 |
4344 |
FARGO |
INSTALL TWO ARM HOME AND DISTANT SIGNAL IN PLACE OF CURRENT ONE ARM HOME SIGNAL #1712 TO PROVIDE A DOUBLE DISTANT INDICATION FOR THE HOME SIGNAL |
Oct 14/29 |
$700.00 |
Sep 24/29 |
4361 |
WELLAND |
CHANGE MECHANICAL SIGNALS TO ELECTRIC COLOUR SIGNALS AT GTRR CROSSING. CHANGE MECHANICAL SIGNALS 3-4-22-24 TO COLOUR LIGHT SIGNALS - ALSO CHANGE MECHANICALLY OPERATED DWARF SIGNAL 1-2-23-26 AND THE MECHANICALLY OPERATED HIGH SIGNAL 25 TO COLOUR LIGHT SIGNALS |
Oct 31/29 |
$9874.00 |
Oct 23/29 |
4384 |
WINDSOR YARD |
INTERCHANGE TRACK WITH WE&LS IS BEING BUILT NEAR TOWER 4 WINDSOR - INSTALL SWITCH CONNECTED DERAIL DUE DESCENDING GRADE TO WE&LS |
Nov 21/29 |
|
Nov 8/29 |
4395 |
YARMOUTH |
INSTALL TAKE SIDING INDICATOR ON THE MAST OF THE WESTBOUND HOME INTERLOCKING SIGNAL AT YARMOUTH |
Nov 29.29 |
$223.41 |
Nov 12/29 |
4397-A |
PELTON |
INSTALLATION OF LIGHTNING FLASH SIGNALS AT WALKER RD. WEST OF PELTON |
Dec 13/29 |
$1831.32 |
Nov 12/29 |
4404-A |
PELTON |
INSTALLATION OF LIGHTNING FLASH SIGNALS AT CONCESSION ROAD - EAST OF PELTON |
Dec 27/29 |
$2025.61 |
Nov 12/29 |
4404-B |
PELTON |
AUTOMATIC BLOCK SIGNAL CIRCUIT CHANGES ON ACCOUNT OF INSTALLATION OF LIGHTNING FLASH SIGNALS AT CONCESSION ROAD - EAST OF PELTON |
Dec 27/29 |
$527.94 |
Nov 18/29 |
4425-A |
WELLAND |
INSTALLATION OF HIGHWAY CROSSING WIGWAG SIGNALS AND BELLS AT PARKER RD. WEST OF WELLAND |
Nov 20/29 |
$1708.77 |
Nov 18/29 |
4439 |
ST. THOMAS |
REMOVAL OF CROSSING BELLS - PARK AVE. - ST. THOMAS ACCOUNT ROAD CLOSED |
Dec 2/29 |
|
Nov 18/29 |
4440 |
VICTORIA PARK |
REMOVAL OF WIGWAG SIGNALS AT BENDER AVE - WHICH WAS CLOSED NOVEMBER 6, 1929 BECAUSE OF INSTALLATION OF SUBWAY NEAR BENDER AVE. |
Dec 2/29 |
|
Nov 26/29 |
4398-A |
ATTERCLIFFE |
INSTALL LIGHTNING FLASHLIGHT SIGNALS & BELLS AT MCLAUGHLIN ROAD - 0.64 MILES EAST OF STATION - ATTERCLIFFE |
Mar 6/30 |
$2056.50 |
Nov 26/29 |
4399-A |
MULL |
INSTALL LIGHTNING FLASHLIGHT SIGNALS & BELLS AT CENTER LINE ROAD - 2.2 MILES WEST OF STATION - MULL |
May 20/30 |
$1850.17 |
Nov 26/29 |
4401-A |
TILBURY |
INSTALL LIGHTNING FLASHLIGHT SIGNALS & BELLS AT 5TH CONCESSION ROAD - 2.52 MILES WEST OF STATION - TILBURY |
Jul 23/30 |
$1791.75 |
Nov 26/29 |
4402-A |
STEVENSVILLE |
INSTALL LIGHTNING FLASHLIGHT SIGNALS & BELLS AT CLEMENS HAUGE ROAD - .63 MILES EAST OF STATION - STEVENSVILLE |
Jan 31/30 |
$1333.20 |
Nov 26/29 |
4403-A |
TILBURY |
INSTALL LIGHTNING FLASHLIGHT SIGNALS & BELLS AT TRUDELL SIDE ROAD - 3.09 MILES EAST OF STATION - TILBURY |
Jul 22/30 |
$1883.93 |
Nov 26/29 |
4405-A |
SHEDDEN |
INSTALL LIGHTNING FLASHLIGHT SIGNALS & BELLS AT FROME ROAD - 2.5 MILES EAST OF STATION - SHEDDEN |
May 30/30 |
$1782.32 |
Nov 26/29 |
4406-A |
AYLMER |
INSTALL LIGHTNING FLASHLIGHT SIGNALS & BELLS AT CONCESSION ROAD - 0.65 MILES WEST OF STATION - ALYMER |
Jun 14/30 |
$1893.47 |
Nov 26/29 |
4407-A |
CORNELL |
INSTALL LIGHTNING FLASHLIGHT SIGNALS & BELLS AT MIDDLE TOWN LINE ROAD - .29 MILES EAST OF STATION - CORNELL |
Jul 3/30 |
$1964.10 |
Nov 26/29 |
4408-A |
FARGO |
INSTALL LIGHTNING FLASHLIGHT SIGNALS & BELLS AT HUFFMAN ROAD - 1.95 MILES EAST OF STATION - FARGO |
May 20/30 |
$1912.13 |
Nov 26/29 |
4409-A |
WOODSLEE |
INSTALL LIGHTNING FLASHLIGHT SIGNALS & BELLS AT MALDEN ROAD - 0.73 MILES EAST OF STATION - WOODSLEE |
Apr 25/30 |
$1845.06 |
Nov 26/29 |
4410-A |
ESSEX |
INSTALL LIGHTNING FLASH SIGNALS & BELLS AT TOWN LINE ROAD - 0.36 MILES EAST OF STATION - ESSEX |
Apr 10/30 |
$1882.74 |
Nov 26/29 |
4411-A |
BUXTON |
INSTALL LIGHTNING FLASHLIGHT SIGNALS & BELLS AT 8TH CONCESSION ROAD - 0.64 MILES WEST OF STATION - BUXTON |
May 7/30 |
$1916.41 |
Nov 26/29 |
4412-A |
SPRINGFIELD |
INSTALL LIGHTNING FLASHLIGHT SIGNALS & BELLS AT TOWN LINE ROAD - 1.22 MILES EAST OF STATION - SPRINGFIELD |
Jun 18/30 |
$1950.65 |
Nov 26/29 |
4413-A |
CANFIELD |
INSTALL LIGHTNING FLASHLIGHT SIGNALS & BELLS AT DARLING ROAD - 1.96 MILES EAST OF STATION - CANFIELD |
Mar 6/30 |
$1532.50 |
Nov 26/29 |
4414-A |
BROWNSVILLE |
INSTALL LIGHTNING FLASHLIGHT SIGNALS & BELLS AT MIDDLE TOWN LINE ROAD - 2.2 MILES EAST OF STATION - BROWNSVILLE |
Jun 24/30 |
$2294.75 |
Nov 26/29 |
4415-A |
CHARING CROSS |
INSTALL LIGHTNING FLASHLIGHT SIGNALS & BELLS AT DRURY ROAD - 0.93 MILES EAST OF STATION - CHARING CROSS |
May 10/30 |
$1971.80 |
Nov 26/29 |
4416-A |
HAWTREY |
INSTALL LIGHTNING FLASHLIGHT SIGNALS & BELLS AT HAWTREY ROAD - WEST OF STATION - HAWTREY |
Jul 7/30 |
$1581.59 |
Nov 26/29 |
4440-A |
WELLAND |
INSTALL LIGHTNING FLASHLIGHT SIGNALS & BELLS AT LINCOLN ROAD - 1.73 MILES EAST OF STATION - WELLAND |
Dec 27/29 |
$2101.00 |
Nov 26/29 |
4442 |
WELLAND |
MOVE EAST SWITCH #10 OF SOUTH SIDING, DERAIL #17 AND EASTBOUND HOME INTERLOCKING SIGNAL 1 AND 2 SO THAT DERAIL #17 WILL BE APPROXIMATELY 500' WEST OF THE DIAMOND AND SWITCH #10 IS WEST OF THE DERAIL. SWITCH #10 & DERAIL #17 ARE TO BE OPERATED BY US&S CO. TYPE M 110 VOLT ELECTRIC SWITCH MACHINE AND THE PRESENT DWARF SIGNAL #7 IS TO BE MOVED WEST AND TO BE CHANGED TO COLOUR LIGHT DWARF SIGNAL. REMOVE EASTBOUND AUTOMATIC BLOCK SIGNAL #152 AND #162 AND INSTALLING COLOUR LIGHT SIGNALS #154 AND CHANGE #170 SEMAPHORE TYPE DISTANT SIGNAL TO THREE INDICATION COLOUR LIGHT SIGNAL AND CHANGE THE PRESENT SINGLE ARM SIGNAL #180 TO A TWO-ARM HOME AND DISTANT SIGNAL |
Jun 9/30 |
$5944.00 |
Nov 26/29 |
4442-A |
WELLAND |
CHANGE THE PRESENT SEMAPHORE TYPE SIGNALS 1, 2, 3, 4, 34, 35 AND 36 TO COLOUR LIGHT TYPE AND DWARF SIGNALS 5, 6, 7 AND 35 FROM LOWER TO UPPER QUADRANT - EASTBOUND HOME INTERLOCKING SIGNAL |
Jun 13/30 |
$6971.00 |
Nov 26/29 |
4442-A |
WELLAND |
MOVING OF WEST SWITCH OF SOUTH SIDING WEST OF WELLAND DRAWBRIDGE |
Nov 15/29 |
$278.66 |
Nov 29/29 |
4427 |
RUSCOMB |
INSTALL WIGWAG SIGNALS & BELL IN ADDITION TO CURRENT BELL AT SID ROAD - RUSCOMB |
Apr 25/30 |
$959.09 |
Nov 29/29 |
4428 |
SPRINGFIELD |
INSTALL WIGWAG SIGNALS & BELL IN ADDITION TO CURRENT BELL AT HORNBY STREET - SPRINGFIELD |
Jun 28/30 |
$867.00 |
Nov 29/29 |
4429 |
ESSEX |
INSTALL WIGWAG SIGNALS & BELL IN ADDITION TO CURRENT BELL AT NAYLOR ROAD - ESSEX |
Apr 10/30 |
$907.24 |
Nov 29/29 |
4431 |
RIDGETOWN |
INSTALL WIGWAG SIGNALS & BELL IN ADDITION TO CURRENT BELL AT ERIE AVE. - RIDGETOWN |
May 26/30 |
$793.00 |
Nov 29/29 |
4432 |
FLETCHER |
INSTALL WIGWAG SIGNALS & BELL IN ADDITION TO CURRENT BELL AT TOWN LINE ROAD - FLETCHER |
Apr 30/30 |
$1625.00 |
Nov 29/29 |
4433 |
LYTHMORE |
INSTALL WIGWAG SIGNALS & BELL IN ADDITION TO CURRENT BELL AT JACKSON'S CROSSING - LYTHMORE |
Mar 8/30 |
$945.00 |
Nov 29/29 |
4434 |
IONA |
INSTALL WIGWAG SIGNALS & BELL IN ADDITION TO CURRENT BELL AT TOWN LINE ROAD - IONA |
May 26/30 |
$1110.00 |
Nov 30/29 |
4430 |
BUXTON |
INSTALL WIGWAG SIGNALS & BELL IN ADDITION TO CURRENT BELL AT CENTER ROAD - BUXTON |
May 7/30 |
$995.31 |
Dec 3/29 |
4417-A |
ESSEX |
INSTALL WIGWAG SIGNALS & BELLS AT TOWN LINE ROAD - 0.7 MILES WEST OF STATION - ESSEX |
Apr 10/30 |
$1750.39 |
Dec 4/29 |
4418-A |
MULL |
INSTALL WIGWAG SIGNALS & BELLS AT SIDE ROAD - MULL |
May 20/30 |
$2654.50 |
Dec 4/29 |
4419-A |
HAGERSVILLE |
INSTALL WIGWAG SIGNALS & BELLS AT SMITH ROAD - HAGERSVILLE |
Jul 12/30 |
$1690.00 |
Dec 4/29 |
4420-A |
FLETCHER |
INSTALL WIGWAG SIGNALS & BELL IN ADDITION TO CURRENT BELL AT 7TH CONCESSION - FLETCHER |
May 1/30 |
$2572.00 |
Dec 4/29 |
4421-A |
KINGSMILL |
INSTALL WIGWAG SIGNALS & BELLS AT TOWN LINE ROAD - KINGSMILL |
Jun 7/30 |
$2165.00 |
Dec 4/29 |
4422-A |
TILLSONBURG |
INSTALL WIGWAG SIGNALS & BELLS AT TOWN LINE ROAD - TILLSONBURG |
Jun 26/30 |
$2030.00 |
Dec 4/29 |
4423-A |
MONTAGUE |
INSTALL WIGWAG SIGNALS & BELLS AT WELLANDSPORT ROAD - MONTAGUE |
Feb 14/30 |
$2313.00 |
Dec 4/29 |
4424-A |
AYLMER |
INSTALL WIGWAG SIGNALS & BELLS AT MIDDLE ROAD - AYLMER |
Jun 14/30 |
$2097.00 |
Dec 4/29 |
4426-A |
LASALETTE |
INSTALL WIGWAG SIGNALS & BELLS AT COUNCIL ROAD - LASALETTE |
Jul 10/30 |
$2400.00 |
Dec 16/29 |
4452 |
ATTERCLIFFE |
INSTALL LIGHTNING FLASH SIGNALS & BELL IN ADDITION TO CURRENT BELL AT DILTZ ROAD - ATTERCLIFFE |
Mar 1/30 |
$1108.50 |
Dec 16/29 |
4453 |
WINDHAM |
INSTALL LIGHTNING FLASH SIGNALS IN ADDITION TO CURRENT BELLS AT SIDE ROAD - WINDHAM |
Mar 15/30 |
$1188.45 |
Dec 16/29 |
4454 |
ESSEX |
INSTALL LIGHTNING FLASH SIGNALS & BELL IN ADDITION TO CURRENT BELL AT THOMAS STREET - ESSEX |
Apr 10/30 |
$7010.50 |
Dec 16/29 |
4455 |
TOWNSEND |
INSTALL LIGHTNING FLASH SIGNALS & BELL IN ADDITION TO CURRENT BELL AT TOWN LINE ROAD - TOWNSEND |
Mar 18/30 |
$1285.44 |
Dec 16/29 |
4456 |
ATTERCLIFFE |
INSTALL LIGHTNING FLASH SIGNALS & BELL IN ADDITION TO CURRENT BELL AT MOOTE ROAD - ATTERCLIFFE |
Mar 1/30 |
$1080.13 |
Dec 16/29 |
4458 |
ST. THOMAS |
INSTALL LIGHTNING FLASH SIGNALS & BELL IN ADDITION TO CURRENT BELL AT CHURCH ST. - ST. THOMAS |
Mar 31/30 |
$901.14 |
Dec 16/29 |
4459 |
ST. THOMAS |
INSTALL LIGHTNING FLASH SIGNALS & BELL IN ADDITION TO CURRENT BELL AT METCALFE ST. - ST. THOMAS |
Mar 31/30 |
$871.10 |
Dec 16/29 |
4460 |
ST. THOMAS |
INSTALL LIGHTNING FLASH SIGNALS & BELL IN ADDITION TO CURRENT BELL AT STANLEY ST. - ST. THOMAS |
Mar 31/30 |
$817.96 |
Dec 16/29 |
4461 |
ST. THOMAS |
INSTALL LIGHTNING FLASH SIGNALS & BELL IN ADDITION TO CURRENT BELL AT QUEEN ST. - ST. THOMAS |
Mar 31/30 |
$775.31 |
Dec 16/29 |
4462 |
ST. THOMAS |
INSTALL LIGHTNING FLASH SIGNALS & BELL IN ADDITION TO CURRENT BELL AT WILLIAM ST. - ST. THOMAS |
Mar 31/30 |
$807.98 |
Dec 16/29 |
4463 |
ST. THOMAS |
INSTALL LIGHTNING FLASH SIGNALS & BELL IN ADDITION TO CURRENT BELL AT WHITE ST. - ST. THOMAS |
Mar 31/30 |
$804.52 |
Feb 24/30 |
4491 |
ST. THOMAS |
REPLACE POLE LINE AND WIRES WITH UNDERGROUND AND SERIAL CABLE. FROM PLEASANT STREET EAST TO THE LONDON & PORT STANLEY CROSSING A DISTANCE OF 4900 FEET, THE PRESENT POLE LINE WILL BE REMOVED AND REBUILD ON THE SOUTH SIDE OF THE TRACKS AND SERIAL CABLE USED. BETWEEN L&PS CROSSING AND THE EAST END OF THE YARD A DISTANCE OF 3300 FEET, AN UNDERGROUND DUCT LINE WILL BE INSTALLED AND UNDERGROUND CABLE USED. (NOTE ON ORDER: PORTION FROM PLEASANT STREET TO BX TOWER NEVER DONE ). |
Oct 27/36 |
$15500.00 |
Jul 9/30 |
4541 |
WINDSOR |
INSTALL 2 75' POLES AND PLATFORM TO REPLACE STEEL TOWER SUPPORTING FLOODLIGHTS |
Dec 22/30 |
$1050.00 |
Jul 31/30 |
4550 |
BRIDGEBURG TO NIAGARA JCT. |
RECONSTRUCTION OF POLE LINE - REBUILDING OF POLE LINE AND INSTALLATION OF AERIAL AND UNDERGROUND CABLE AND OPEN WIRES FROM BRIDGEBURG TO WEST OF NIAGARA JCT. - A DISTANCE OF ABOUT 3.6 MILES. A 15 CONDUCTOR AND THREE CONDUCTOR CABLE WILL BE USED ON THE POLE LINE TO A POINT ABOUT 1/2 WEST OF NIAGARA JCT. WITH THE EXCEPTION OF ABOUT 1100' WEST FROM THE NIAGARA RIVER AND A SECTION OF ABOUT 800' THROUGH VICTORIA YARDS WHERE UNDERGROUND DUCT WILL BE USED. FROM A POINT ABOUT 1/2 WEST OF NIAGARA JCT. TO A POINT 1.5 MILES WEST WE WILL HAVE ONE ARM ON THE FOURTH GAIN, THE 5TH GAIN TO BE RESERVED FOR FUTURE SIGNAL WIRES. THE WORK IN CONNECTION WITH THE INSTALLATION OF COLOUR LIGHT SIGNAL THROUGH THIS SECTION |
Jul 14/31 |
$14600.00 |
Jul 31/30 |
4551 |
WINDSOR |
WIDENING OF DOUGAL ROAD - CHANGE TO POLE LINES AND FLOOD LIGHTS |
Jan 19/31 |
$1500.00 |
Aug 13/30 |
4567 |
WELLAND |
INSTALL 2 FEDERAL TYPE A SIRENS TO DRAWBRIDGE |
Sep 19/30 |
$150.00 |
Aug 20/30 |
4569 |
ESSEX |
MOVE SIGNALS, CROSSING GATES AND DERAILS ON ACCOUNT OF THE WIDENING OF TALBOT STREET |
Aug 9/30 |
$717.00 |
Sep 2/30 |
4579 |
NIAGARA FALLS |
MOVE HIGHWAY CROSSING LIGHTNING FLASH SIGNAL ACCOUNT WIDENING OF CLIFTON HILL STREET - MOVE SIGNAL FROM SIDE OF ROAD TO CENTRE OF ROAD |
Oct 10/30 |
$97.00 |
Nov 3/30 |
4619 |
WATERFORD |
CONSTRUCTION OF OVER-HEAD BRIDGE AT MAIN STREET |
Aug 15/31 |
|
Nov 3/30 |
4620 |
WATERFORD |
REMOVE HIGHWAY CROSSING PROTECTION SIGNAL AT ST. JAMES ST. - ACCOUNT ROAD CLOSING - WORK CANCELLED JULY 6/31 - CROSSING PROTECTION TO BE RETAINED |
|
|
Mar 5/31 |
4654 |
CAYUGA |
REMOVAL OF SWITCH CONNECTED HAYES DERAIL AT GRAND RIVER PUMP HOUSE SPUR - ACCOUNT REMOVAL OF SPUR |
Jan 3/31 |
|
Mar 5/31 |
4662 |
ST. THOMAS |
REMOVAL OF 3 BUILDINGS: 1) 18' X 32' FRAME BUILDING LOCATED EAST OF THE CAR SHOP - FORMERLY USED FOR STORING MATERIAL. BUILDING CONSTRUCTED ABOUT 1917. 2) 30' X 70' FRAME BUILDING LOCATED WEST OF THE CAR SHOP ORIGINALLY USED FOR STORING ANTHRACITE COAL AND CAR DEPARTMENT MATERIAL AND LATER USED AS AN AIR BRAKE SHOP. ORIGINALLY CONSTRUCTED PRIOR TO 1910. 3) 16' X 30' FRAME BUILDING LOCATED EAST OF THE LOCOMOTIVE DEPARTMENT MACHINE SHOP AND USED BY THE STORES DEPARTMENT FOR STORAGE OF FINISHED LOCOMOTIVE CASTINGS |
Mar 10/31 |
|
Mar 6/31 |
4683 |
CHARING CROSS |
REMOVE DERAILS ON INTERCHANGE TRACK WITH CW&LE - ACCOUNT TRACKS TO BE REMOVED DURING THE PRESENT MONTH |
May 11/31 |
|
Mar 6/31 |
4684 |
WELLAND |
INSTALL ELECTRIC LIGHTS IN PASSENGER STATION FOR RAILWAY EXPRESS AGENCY - THEY ARE TO VACATE PRESENT QUARTERS ON JUNE 1ST. |
May 23/31 |
|
Jun 16/31 |
4694 |
TILBURY |
INSTALL WIGWAG SIGNALS & BELLS AT TILBURY ST. - TILBURY |
Aug 11/31 |
$809.55 |
Jun 16/31 |
4698 |
SPRINGFIELD |
INSTALL 2 AUTOMATIC WIGWAG SIGNALS & BELLS AT SIDE ROAD - SPRINGFIELD |
Aug 6/31 |
$1057.14 |
Jun 23/31 |
4702 |
FLETCHER |
INSTALL AUTOMATIC WIGWAG SIGNALS & BELLS AT CONCESSION ROAD - FLETCHER |
Aug 20/31 |
$1400.00 |
Jun 23/31 |
4703 |
HAWTREY |
INSTALL AUTOMATIC WIGWAG SIGNALS & BELLS AT COLE ROAD - HAWTREY |
Aug 26/31 |
$1005.12 |
Jun 24/31 |
4704 |
ST. CLAIR JCT. |
INSTALL AUTOMATIC WIGWAG SIGNALS & BELLS AT SIDE ROAD - ST. CLAIR JUNCTION |
Aug 20/31 |
$1131.31 |
Jun 24/31 |
4705 |
LYTHMORE |
INSTALL AUTOMATIC WIGWAG SIGNALS & BELLS AT SIDE ROAD - LYTHMORE |
Aug 28/31 |
$1700.00 |
Jun 24/31 |
4706 |
BROWNSVILLE |
INSTALL AUTOMATIC WIGWAG SIGNALS & BELLS AT TOWN LINE ROAD - BROWNSVILLE |
Aug 20/31 |
$974.23 |
Jun 24/31 |
4707 |
PERRY |
INSTALL AUTOMATIC WIGWAG SIGNALS & BELLS AT SIDE ROAD - PERRY |
Aug 28/31 |
$1104.85 |
Jun 24/31 |
4708 |
FRASER |
INSTALL 2 AUTOMATIC WIGWAG SIGNALS & BELLS AT 2ND CONCESSION ROAD - FRASER |
Dec 2/31 |
$1500.00 |
Jun 24/31 |
4709 |
CANFIELD |
INSTALL 2 AUTOMATIC WIGWAG SIGNALS & BELLS AT DARKEY SIDE ROAD - CANFIELD |
Aug 27/31 |
$1148.24 |
Jul 27/31 |
4724 |
CANFIELD |
INSTALL 2 AUTOMATIC WIGWAG SIGNALS & BELLS AT FIRST SIDE ROAD - CANFIELD |
Aug 29/31 |
$1500.00 |
Jul 27/31 |
4725 |
MAIDSTONE |
INSTALL 2 AUTOMATIC WIGWAG SIGNALS & BELLS AT MALDEN ROAD - MAIDSTONE |
Sep 30/31 |
$1800.00 |
Jul 27/31 |
4726 |
PELTON |
INSTALL 2 AUTOMATIC WIGWAG SIGNALS & BELLS AT 4TH CONCESSION ROAD - PELTON |
Sep 24/31 |
$1347.18 |
Jul 27/31 |
4730 |
HAWTREY |
INSTALL 2 AUTOMATIC WIGWAG SIGNALS & BELLS AT TOWN LINE ROAD - HAWTREY |
Oct 10/31 |
$1500.00 |
Jul 27/31 |
4731 |
NETHERBY |
INSTALL 2 AUTOMATIC WIGWAG SIGNALS & BELLS AT SCHOOL ROAD - NETHERBY |
Sep 26/31 |
$1650.00 |
Jul 27/31 |
4732 |
PELTON |
INSTALL 2 AUTOMATIC WIGWAG SIGNALS & BELLS AT TOWN LINE ROAD - PELTON |
Sep 23/31 |
$1810.00 |
Jul 27/31 |
4733 |
BRIDGEBURG |
INSTALL 2 AUTOMATIC WIGWAG SIGNALS & BELLS AT LIGHTENBURGER ROAD - BRIDGEBURG |
Sep 25/31 |
$1750.00 |
Jul 27/31 |
4734 |
EDWARDS |
INSTALL 2 AUTOMATIC WIGWAG SIGNALS & BELLS AT MACFARLANE ROAD - EDWARDS |
Oct 3/31 |
$1525.00 |
Jul 27/31 |
4735 |
BRIDGEBURG |
INSTALL 2 AUTOMATIC WIGWAG SIGNALS & BELLS AT SCHOOL HOUSE ROAD - BRIDGEBURG |
Sep 23/31 |
$1650.00 |
Jul 27/31 |
4736 |
BROOKFIELD |
INSTALL 2 AUTOMATIC WIGWAG SIGNALS & BELLS AT COUNTY ROAD - BROOKFIELD |
Sep 29/31 |
$1730.00 |
Jul 27/31 |
4737 |
KINGSMILL |
INSTALL 2 AUTOMATIC WIGWAG SIGNALS & BELLS AT EDGEWARE ROAD - KINGSMILL |
Sep 16/31 |
$1550.00 |
Jul 27/31 |
4738 |
WELLAND |
INSTALL 2 AUTOMATIC WIGWAG SIGNALS & BELLS AT RACEWAY STREET - WELLAND |
Dec 2/31 |
$1575.00 |
Jul 27/31 |
4739 |
PELTON |
INSTALL 2 AUTOMATIC WIGWAG SIGNALS & BELLS AT SEXTON SIDE ROAD - PELTON |
Sep 28/31 |
$1850.00 |
Jul 27/31 |
4740 |
PELTON |
INSTALL 2 AUTOMATIC WIGWAG SIGNALS & BELLS AT REAR ROAD - PELTON |
Sep 25/31 |
$1625.00 |
Jul 27/31 |
4741 |
FRASER |
INSTALL 2 AUTOMATIC WIGWAG SIGNALS & BELLS AT ARGYLE & SIDE ROAD - FRASER |
Dec 2/31 |
$2580.00 |
Jul 29/31 |
4727 |
TOWNSEND |
INSTALL 2 AUTOMATIC WIGWAG SIGNALS & BELLS AT SPRINGVALE ROAD - TOWNSEND |
Sep 4/31 |
$1900.00 |
Jul 29/31 |
4728 |
DUFFERIN |
INSTALL 2 AUTOMATIC WIGWAG SIGNALS & BELLS AT 2ND TOWN LINE ROAD - DUFFERIN |
Sep 5/31 |
$1650.00 |
Jul 29/31 |
4729 |
YARMOUTH |
INSTALL 2 AUTOMATIC WIGWAG SIGNALS & BELLS AT SIDE ROAD - YARMOUTH |
Sep 12/31 |
$1825.00 |
Jul 29/31 |
4742 |
WELLAND |
INSTALL 2 AUTOMATIC WIGWAG SIGNALS & BELLS AT HENSLAR ROAD - WELLAND |
Jan 29/32 |
$1840.00 |
Jul 29/31 |
4743 |
WELLAND |
INSTALL 2 AUTOMATIC WIGWAG SIGNALS & BELLS AT SOUTHWORTH STREET - WELLAND |
Dec 1/31 |
$1700.00 |
Jul 29/31 |
4744 |
FRASER |
INSTALL 2 AUTOMATIC WIGWAG SIGNALS & BELLS AT CREEK ROAD - FRASER |
Dec 2/31 |
$1780.00 |
Jul 29/31 |
4745 |
LASALETTE |
INSTALL 2 AUTOMATIC WIGWAG SIGNALS & BELLS AT LASALETTE ROAD - LASALETTE |
Oct 10/31 |
$1790.00 |
Jul 29/31 |
4746-A |
WELLAND |
INSTALL 2 AUTOMATIC WIGWAG SIGNALS & BELLS AT CARL'S ROAD - WELLAND |
Dec 1/31 |
$1300.00 |
Aug 3/31 |
4756 |
WELLAND |
18' X 30' FRAME BUILDING IN THE OLD YARD AT WELLAND - FORMERLY USED BY YARD CLERKS AND CAR DEPARTMENT EMPLOYEES WAS DESTROYED BY FIRE ON MAY 10TH, 1931 - REMOVE ANY NECESSARY ELECTRICAL WORK |
|
|
Oct 14/31 |
4806 |
RIDGETOWN |
RELOCATE LIGHTNING FLASH SIGNALS AT HIGHWAY #21 - 1.05 MILES EAST OF RIDGETOWN - ACCOUNT ROAD WIDENING |
Oct 21/31 |
|
Oct 22/31 |
4808 |
CANFIELD |
RELOCATE WIGWAG SIGNALS AT HIGHWAY #3 - 1.92 MILES WEST OF CANFIELD |
Nov 5/31 |
|
Nov 12/31 |
4819 |
NIAGARA FALLS |
REMOVE 3 STATION PROTECTION SIGNALS ON NIAGARA BRANCH |
Feb 6/32 |
$90.00 |
Nov 12/31 |
4820 |
ST. DAVID'S |
REMOVE STATION PROTECTION SIGNAL |
Feb 6/32 |
$30.00 |
Nov 12/31 |
4821 |
CHIPPAWA |
REMOVE STATION PROTECTION SIGNAL |
Feb 4/32 |
$30.00 |
Jan 7/32 |
4840 |
AMHERSTBURG |
INSTALL HAYES DERAIL ON SIMRALL REFINING CORP. TRACK OPERATED FROM SEPARATE SWITCHSTAND |
Jan 11/32 |
$60.00 |
May 9/32 |
4853 |
TILLSONBURG |
INSTALL WIGWAG SIGNALS & BELLS AT TILLSON AVE. - TILLSONBURG |
Jun 4/32 |
$2160.00 |
Jun 14/32 |
4859 |
MUIRKIRK |
INSTALL WIGWAG SIGNALS & BELLS TO REPLACE CROSSING GATES AT ST. ANDREWS - MUIRKIRK |
Jun 28/32 |
$2125.00 |
Sep 16/32 |
4879 |
NIAGARA FALLS |
INSTALL DERAIL ON NEW INDUSTRIAL SIDING - 372' LONG AT KOTEX CO. OF CANADA |
|
|
Jan 6/33 |
4899 |
ESSEX |
REMOVE DIAMOND AT WE&LS INTERLOCKING AT TALBOT STREET - ESSEX ACCOUNT DISCONTINUED SERVICE BY WE&LS |
|
|
Mar 3/33 |
4906 |
WATERFORD |
REMOVE WIGWAG SIGNALS AT ST. JAMES ST. - LEAVING HIGHWAY CROSSING BELLS IN PLACE |
Mar 9/33 |
|
Mar 3/33 |
4907 |
PELTON |
INSTALL WIGWAG SIGNALS AT WALKER RD. IN LIEU OF THE LIGHTNING FLASH SIGNALS NOW MAINTAINED |
Mar 15/33 |
$294.00 |
Apr 17/33 |
4910 |
ST. THOMAS |
INSTALL REMOTE CONTROL FROM THE POWER HOUSE AT ST. THOMAS FOR THE TWO PUMPS AT PINAFORE LAKE. A DEMAND METER TO BE RENTED FROM HYDRO-ELECTRIC IS TO BE INSTALLED AT THE PUMP HOUSE |
Jun 7/33 |
$175.00 |
Apr 17/33 |
4911 |
ST. THOMAS |
INSTALL WIGWAG SIGNALS AT TALBOT ST ON THE L&PS |
Apr 20/33 |
|
May 16/33 |
4918 |
WATERFORD |
DISCONTINUE ( DO NOT REMOVE) WIGWAG SIGNAL AT WATERFORD PASSENGER STATION FOR PURPOSE OF WARNING PASSENGERS AND EMPLOYEES OF TH&B TRAINS OF THE APPROACH OF MICHIGAN CENTRAL TRAINS |
May 15/33 |
|
Oct 1/33 |
4930 |
NIAGARA FALLS |
INSTALL DOUBLE AUTOMATIC WIGWAG SIGNALS & BELLS AT CLIFTON HILL ROAD - NIAGARA FALLS IN LIEU OF THE PRESENT CENTRE OF STREET LIGHTNING FLASH SIGNAL |
Dec 13/33 |
$300.00 |
Oct 5/33 |
4931 |
COMBER |
INSTALL DOUBLE AUTOMATIC WIGWAG SIGNALS & BELLS AT MAIN STREET - COMBER IN LIEU OF THE PRESENT HIGHWAY CROSSING GATES. LAYOUT SHALL BE ARRANGED THAT THE BELLS AND WIGWAGS CAN BE CUT OUT DURING SWITCHING OPERATIONS |
Oct 24/33 |
$1716.00 |
Oct 5/33 |
4932 |
ESSEX |
INSTALL DOUBLE AUTOMATIC WIGWAG SIGNALS & BELLS AT TALBOT STREET - ESSEX IN LIEU OF THE PRESENT HIGHWAY CROSSING GATES. LAYOUT SHALL BE ARRANGED THAT THE BELLS AND WIGWAGS CAN BE CUT OUT DURING SWITCHING OPERATIONS |
Dec 19/33 |
$2270.00 |
Oct 5/33 |
4933 |
TILBURY |
INSTALL DOUBLE AUTOMATIC WIGWAG SIGNALS & BELLS AT QUEEN STREET - TILBURY IN LIEU OF THE PRESENT HIGHWAY CROSSING GATES |
Dec 4/33 |
$2621.00 |
Jan 3/34 |
4950 |
DUTTON |
INSTALL DOUBLE AUTOMATIC WIGWAG SIGNALS & BELLS AT MAIN STREET - DUTTON IN LIEU OF THE PRESENT HIGHWAY CROSSING GATES. |
Apr 9/34 |
$1637.14 |
Jan 3/34 |
4951 |
HIGHGATE |
INSTALL DOUBLE AUTOMATIC WIGWAG SIGNALS & BELLS AT KING STREET - COMBER IN LIEU OF THE PRESENT HIGHWAY CROSSING GATES. |
Feb 26/34 |
$1750.96 |
Jan 3/34 |
4952 |
RODNEY |
INSTALL DOUBLE AUTOMATIC WIGWAG SIGNALS & BELLS AT FURNIVAL ROAD - RODNEY IN LIEU OF THE PRESENT HIGHWAY CROSSING GATES. |
Mar 12/34 |
$1627.19 |
Jan 3/34 |
4953 |
WEST LORNE |
INSTALL DOUBLE AUTOMATIC WIGWAG SIGNALS & BELLS AT GRAHAM STREET - WEST LORNE LIEU OF THE PRESENT HIGHWAY CROSSING GATES. |
Mar 26/34 |
$1705.91 |
Jan 3/34 |
4952 |
RODNEY |
INSTALL DOUBLE AUTOMATIC WIGWAG SIGNALS & BELLS AT FURNIVAL ROAD - RODNEY IN LIEU OF THE PRESENT HIGHWAY CROSSING GATES. |
Mar 12/34 |
$1627.19 |
Jul 21/34 |
5005 |
TILBURY |
REMOVE PORTION OF TRACK BUILT FOR THE PROVINCIAL HIGHWAY DEPT. |
May 23/34 |
|
Nov 7/34 |
5019 |
LASALETTE |
INSTALL SWITCH CONNECTED DERAIL ON THE WYE TRACK. WYE TRACK UP TO THE PROPERTY LINE AT LASALETTE IS TO BE USED AS A TEAM TRACK |
Nov 13/34 |
|
Jan 23/35 |
5023 |
CHARING CROSS & BUXTON |
TELEGRAPH DEPARTMENT IS TO REBUILD POLE LINE BETWEEN MP 183 CHARING CROSS & MP 188 BUXTON |
May 17/35 |
|
Jan 23/35 |
5024 |
FLETCHER |
TELEGRAPH DEPARTMENT IS TO REBUILD POLE LINE BETWEEN MP 194 & 197 - FLETCHER TO TILBURY |
Oct 2/35 |
|
Mar 18/35 |
5033 |
NIAGARA FALLS |
INSTALL COLOUR LIGHT SIGNALS AT THE NSTC&T AND MCRR CROSSING AT QUEEN ST. |
Apr 30/35 |
$345.21 |
Apr 19/35 |
5043 |
NIAGARA FALLS |
INSTALL AUTOMATIC WIGWAG SIGNALS & BELLS AT QUEEN ST ON THE MAIN LINE |
May 29/35 |
|
Apr 24/35 |
5045 |
NIAGARA FALLS |
INSTALL A CUT-OUT SWITCH AT CLIFTON HILL ROAD SO WIGWAG SIGNALS AND BELLS CAN BE CUT-OUT BY TRAINMEN |
May 27/35 |
$159.46 |
Jun 13/35 |
5051 |
RIDGETOWN |
INSTALL MOTOR AND COMPENSATOR IN LIEU OF GAS PRODUCER AND GAS ENGINE IN THE PUMP HOUSE |
Sep 21/35 |
|
Jun 19/35 |
5065 |
NIAGARA JUNCTION |
SIGNAL WORK ACCOUNT RETIREMENT OF CROSSOVER BETWEEN MAIN TRACKS - CROSSOVER REMOVED OCTOBER 5TH, 1932 |
Jun 25/35 |
|
Jun 21/35 |
5061 |
CORNELL |
SIGNAL WORK ACCOUNT RETIREMENT OF SPUR TRACK OFF EASTBOUND MAIN TRACK |
Jul 31/35 |
|
Jun 21/35 |
5062 |
NIAGARA JUNCTION |
SIGNAL WORK ACCOUNT RETIREMENT OF CROSSOVER - CROSSOVER REMOVED OCTOBER 7TH, 1932 |
Jun 25/35 |
|
Jun 21/35 |
5063 |
BROOKFIELD |
SIGNAL CHANGES ACCOUNT REMOVAL OF MAIN-TO-MAIN CROSSOVER WEST OF SIDE ROAD - BROOKFIELD ( CROSSOVER REMOVED SEPTEMBER 30/1932) |
Jun 13/35 |
|
Jun 21/35 |
5064 |
MONTROSE |
SIGNAL WORK ACCOUNT RETIREMENT OF CROSSOVER AT EAST END OF YARDS - CROSSOVER REMOVED SEPTEMBER 30TH, 1932 |
Jun 25/35 |
|
Aug 17/35 |
5106 |
FRASER |
SIGNAL WORK ACCOUNT RETIREMENT OF SPUR TRACK EAST OF TOWN LINE ROAD, FRASER |
Aug 13/35 |
|
Oct 7/35 |
5117 |
WOODSLEE |
REMOVE TRAIN ORDER SIGNAL AT WOODSLEE |
Oct 31/35 |
$30.00 |
Oct 7/35 |
5118 |
MULL |
REMOVE TRAIN ORDER SIGNAL AT MULL |
Oct 31/35 |
$30.00 |
Oct 7/35 |
5119 |
BROWNSVILLE |
REMOVE TRAIN ORDER SIGNAL AT BROWNSVILLE |
Oct 31/35 |
$30.00 |
Oct 7/35 |
5120 |
WINDHAM |
REMOVE TRAIN ORDER SIGNAL AT WINDHAM |
Oct 31/35 |
$30.00 |
Oct 7/35 |
5121 |
STEVENSVILLE |
REMOVE TRAIN ORDER SIGNAL AT STEVENSVILLE |
Oct 31/35 |
$30.00 |
Oct 7/35 |
5122 |
WATERFORD |
RETIRE THE WIGWAG SIGNAL USED AS A STATION PROTECTION SIGNAL FOR TH&B TRAINS |
Oct 31/35 |
$30.00 |
Nov 6/35 |
5126 |
CANFIELD TO HAGERSVILLE |
WESTERN UNION TO REBUILD POLE LINE BETWEEN CANFIELD AND HAGERSVILLE. THE PRESENT LINE CONSISTS OF E-WC POLES SPACED 40 PER MILE AND THE PROPOSED LINE WILL BE CONSTRUCTED OF C-YP #1 POLES SPACED 53 PER MILE. |
Oct 16/36 |
|
Nov 11/35 |
5132 |
RUSCOMB |
SIGNAL WORK ACCOUNT REMOVAL OF SOUTH SPUR TRACK |
Nov 27/35 |
|
Nov 12/35 |
5134 |
DUFFERIN |
SIGNAL WORK ACCOUNT REMOVAL OF NORTH SIDE TRACK |
Nov 20/35 |
|
Nov 12/35 |
5135 |
ST. CLAIR JUNCTION |
SIGNAL WORK ACCOUNT REMOVAL OF NORTH SIDE TRACK |
Nov 21/35 |
|
Nov 12/35 |
5136 |
TAYLOR |
SIGNAL WORK ACCOUNT REMOVAL OF NORTH SIDE TRACK AND STORAGE TRACK |
Nov 25/35 |
|
Nov 12/35 |
5137 |
WINDHAM |
SIGNAL WORK ACCOUNT REMOVAL OF NORTH PASSING TRACK |
Nov 20/35 |
|
Nov 12/35 |
5138 |
DUTTON |
SIGNAL WORK ACCOUNT REMOVAL OF PORTION OF NORTH PASSING TRACK |
Nov 21/35 |
|
Nov 22/35 |
5149 |
BUXTON |
REMOVE TRAIN ORDER SIGNAL AT BUXTON |
Dec 6/35 |
|
Nov 22/35 |
5150 |
MAIDSTONE |
REMOVE TRAIN ORDER SIGNAL AT MAIDSTONE |
Dec 6/35 |
|
Jan 8/36 |
5161 |
RIDGETOWN |
REPLACE THE MORRISON LIGHTNING FLASH SIGNALS WITH STANDARD DOUBLE BELLS AND WIGWAGS AT VICTORIA AVE. - RIDGETOWN |
Mar 4/36 |
$596.00 |
Jan 16/36 |
5162 |
NIAGARA FALLS |
REPLACE THE MORRISON LIGHTNING FLASH SIGNALS ON THE WEST SIDE OF CLIFTON HILL STREET WITH WIGWAGS AND BELLS |
Mar 6/36 |
$596.00 |
Mar 31/36 |
5171 |
WATERFORD |
INSTALL DOUBLE WIGWAGS AND BELLS AT TOWN LINE ROAD - WATERFORD IN LIEU OF THE PRESENT LIGHTNING FLASH SIGNALS |
Jun 11/36 |
$545.35 |
Mar 31/36 |
5172 |
NIAGARA FALLS |
INSTALL DOUBLE WIGWAGS AND BELLS AT SIMCOE & ONTARIO STREETS - NIAGARA FALLS IN LIEU OF THE PRESENT LIGHTNING FLASH SIGNALS |
May 22/36 |
$1258.55 |
Mar 31/36 |
5173 |
NIAGARA FALLS |
INSTALL DOUBLE WIGWAGS AND BELLS AT HURON & ERIE STREETS - NIAGARA FALLS IN LIEU OF THE PRESENT LIGHTNING FLASH SIGNALS |
May 19/36 |
$1213.90 |
Mar 31/36 |
5174 |
ATTERCLIFFE |
INSTALL DOUBLE WIGWAGS AND BELLS AT CONCESSION ROAD - ATTERCLIFFE IN LIEU OF THE PRESENT LIGHTNING FLASH SIGNALS |
Jun 2/36 |
$545.35 |
Mar 31/36 |
5175 |
ATTERCLIFFE |
INSTALL DOUBLE WIGWAGS AND BELLS AT MOOTE ROAD - ATTERCLIFFE IN LIEU OF THE PRESENT LIGHTNING FLASH SIGNALS |
Jun 8/36 |
$545.35 |
Mar 31/36 |
5176 |
ATTERCLIFFE |
INSTALL DOUBLE WIGWAGS AND BELLS AT DILTZ ROAD - ATTERCLIFFE IN LIEU OF THE PRESENT LIGHTNING FLASH SIGNALS |
Jun 4/36 |
$545.35 |
Apr 3/36 |
5177 |
ATTERCLIFFE |
INSTALL DOUBLE WIGWAGS AND BELLS AT MCLAUGHLIN ROAD - ATTERCLIFFE IN LIEU OF THE PRESENT LIGHTNING FLASH SIGNALS |
Jun 5/36 |
$600.00 |
Apr 3/36 |
5178 |
ATTERCLIFFE |
INSTALL DOUBLE WIGWAGS AND BELLS AT YOUNG STREET - ATTERCLIFFE IN LIEU OF THE PRESENT LIGHTNING FLASH SIGNALS |
Jun 3/36 |
$600.00 |
Apr 9/36 |
5179 |
ATTERCLIFFE |
INSTALL DOUBLE WIGWAGS AND BELLS AT ROBINSON ROAD - ATTERCLIFFE IN LIEU OF THE PRESENT LIGHTNING FLASH SIGNALS |
Jun 6/36 |
$600.00 |
Apr 9/36 |
5180 |
MONTROSE |
INSTALL DOUBLE WIGWAGS AND BELLS AT STANLEY STREET - MONTROSE IN LIEU OF THE PRESENT LIGHTNING FLASH SIGNALS |
May 26/36 |
$600.00 |
Apr 9/36 |
5181 |
CANFIELD |
INSTALL DOUBLE WIGWAGS AND BELLS AT DARLING ROAD - CANFIELD IN LIEU OF THE PRESENT LIGHTNING FLASH SIGNALS |
Jun 9/36 |
$600.00 |
Apr 9/36 |
5182 |
FRASER |
INSTALL DOUBLE WIGWAGS AND BELLS AT TOWN LINE ROAD - FRASER IN LIEU OF THE PRESENT LIGHTNING FLASH SIGNALS |
May 28/36 |
$600.00 |
Apr 9/36 |
5183 |
NIAGARA FALLS |
INSTALL DOUBLE WIGWAGS AND BELLS AT MORRISON STREET - NIAGARA FALLS IN LIEU OF THE PRESENT LIGHTNING FLASH SIGNALS |
May 20/36 |
$661.60 |
Apr 9/36 |
5184 |
NIAGARA FALLS |
INSTALL DOUBLE WIGWAGS AND BELLS AT EASTWOOD AVE. - NIAGARA FALLS IN LIEU OF THE PRESENT LIGHTNING FLASH SIGNALS |
May 26/36 |
$992.40 |
Apr 9/36 |
5185 |
TOWNSEND |
INSTALL DOUBLE WIGWAGS AND BELLS AT TOWN LINE ROAD - TOWNSEND IN LIEU OF THE PRESENT LIGHTNING FLASH SIGNALS |
Jun 10/36 |
$600.00 |
Apr 9/36 |
5186 |
STEVENSVILLE |
INSTALL DOUBLE WIGWAGS AND BELLS AT CLEMENS ROAD - STEVENSVILLE IN LIEU OF THE PRESENT LIGHTNING FLASH SIGNALS |
Jun 1/36 |
$600.00 |
Apr 9/36 |
5187 |
HAWTREY |
INSTALL DOUBLE WIGWAGS AND BELLS AT HAWTREY ROAD - HAWTREY IN LIEU OF THE PRESENT LIGHTNING FLASH SIGNALS |
Jun 13/36 |
$600.00 |
Apr 9/36 |
5188 |
WINDHAM |
INSTALL DOUBLE WIGWAGS AND BELLS AT SIDE ROAD - WINDHAM IN LIEU OF THE PRESENT LIGHTNING FLASH SIGNALS |
Jun 12/36 |
$600.00 |
Apr 9/36 |
5189 |
WELLAND |
INSTALL DOUBLE WIGWAGS AND BELLS AT LINCOLN ROAD - WELLAND IN LIEU OF THE PRESENT LIGHTNING FLASH SIGNALS |
May 29/36 |
$600.00 |
Apr 21/36 |
5198 |
STEVENSVILLE |
REMOVE NORTH AND SOUTH PASSING TRACK. NORTH PASSING TRACK REMOVED MAY 21. SOUTH PASSING TRACK REMOVED AUGUST 4 |
Aug 4/36 |
|
May 6/36 |
5204 |
RIDGETOWN |
INSTALL DOUBLE WIGWAGS AND BELLS AT THAMESVILLE ROAD - 1.05 MILES EAST OF RIDGETOWN IN LIEU OF THE PRESENT LIGHTNING FLASH SIGNALS |
Jul 15/36 |
$600.00 |
May 11/36 |
5205 |
WOODSLEE |
INSTALL WIGWAGS AND BELLS AT MALDEN ROAD - WOODSLEE IN LIEU OF THE PRESENT LIGHTNING FLASH SIGNALS |
Jul 7/36 |
$600.00 |
May 12/36 |
5206 |
RIDGETOWN |
INSTALL WIGWAGS AND BELLS AT TOWN LINE ROAD - RIDGETOWN IN LIEU OF THE PRESENT LIGHTNING FLASH SIGNALS |
Jul 14/36 |
$600.00 |
May 12/36 |
5207 |
RIDGETOWN |
INSTALL WIGWAGS AND BELLS AT SEANE ROAD - 1.26 MILES WEST OF RIDGETOWN IN LIEU OF THE PRESENT LIGHTNING FLASH SIGNALS |
Jul 13/36 |
$600.00 |
May 12/36 |
5208 |
CORNELL |
INSTALL WIGWAGS AND BELLS AT MIDDLE TOWN ROAD - .29 MILES EAST OF CORNELL IN LIEU OF THE PRESENT LIGHTNING FLASH SIGNALS |
Jul 16/36 |
$600.00 |
May 12/36 |
5209 |
TILBURY |
INSTALL WIGWAGS AND BELLS AT FIFTH CONCESSION ROAD - 2.52 MILES WEST OF TILBURY IN LIEU OF THE PRESENT LIGHTNING FLASH SIGNALS |
Jul 8/36 |
$600.00 |
May 12/36 |
5210 |
TILBURY |
INSTALL WIGWAGS AND BELLS AT TRUDELL SIDE ROAD - 3.09 MILES EAST OF TILBURY IN LIEU OF THE PRESENT LIGHTNING FLASH SIGNALS |
Jul 9/36 |
$600.00 |
May 12/36 |
5211 |
ESSEX |
INSTALL WIGWAGS AND BELLS AT TOWN LINE ROAD - ESSEX IN LIEU OF THE PRESENT LIGHTNING FLASH SIGNALS |
Jul 6/36 |
$600.00 |
May 12/36 |
5212 |
ESSEX |
INSTALL WIGWAGS AND BELLS AT THOMAS STREET - ESSEX IN LIEU OF THE PRESENT LIGHTNING FLASH SIGNALS |
Jul 3/36 |
$600.00 |
May 20/36 |
5214 |
ST. THOMAS |
INSTALL DOUBLE WIGWAGS IN ADDITION TO PRESENT BELL AT SOUTHWICK STREET - ST. THOMAS |
Jun 16/36 |
$320.00 |
May 22/36 |
5215 |
PELTON |
INSTALL WIGWAGS AND BELLS AT CONCESSION ROAD - PELTON IN LIEU OF THE PRESENT LIGHTNING FLASH SIGNALS |
Jul 2/36 |
$600.00 |
May 28/36 |
5217 |
VICTORIA |
RETIRE SIGNAL E-162 ON THE FORT ERIE BRANCH - ON ACCOUNT OF SHORT BLOCKS BETWEEN AUTOMATIC SIGNALS E-154, E-162 AND E-164 AND THE PRESENT HIGH OPERATING SPEEDS - E-162 TO BE ELIMINATED TO PROVIDE PROPER BRAKING DISTANCE |
Jun 10/36 |
|
Jul 6/36 |
5224 |
TILLSONBURG |
MOTOR DRIVEN DEEP WELL PUMP TO BE INSTALLED FOR EMERGENCY WATER SUPPLY |
Sep 8/36 |
$150.00 |
Jul 10/36 |
5227 |
ST. THOMAS |
INSTALL GRINDING MACHINE (TRANSFERRED FROM SELKIRK) IN LOCO SHOP |
Mar 5/37 |
|
Jul 29/36 |
5233 |
RODNEY |
RETIRE TRAIN ORDER SIGNAL AT RODNEY |
Sep 15/36 |
|
Oct 19/36 |
5251 |
ATTERCLIFFE |
REMOVE CROSSOVER WEST OF E&O CROSSING |
Oct 19/36 |
|
Oct 27/36 |
5255 |
EDWARDS |
REMOVE PUMP HOUSE SPUR AT EDWARDS |
Nov 17/36 |
|
Dec 2/36 |
5269 |
RIDGETOWN |
REBUILD POLE LINE BETWEEN RODNEY & MILE POST 77 |
Aug 13/37 |
|
Dec 2/36 |
5271 |
WINDSOR YARD |
INSTALL A THREE POSITION COLOUR LIGHT SIGNAL AT THE SUMMIT OF THE EASTBOUND HUMP AT WINDSOR. THE SIGNAL IS TO BE OPERATED BY AN ELECTRIC SWITCH ON THE MAST OF THE PRESENT MECHANICAL SIGNAL |
Dec 9/36 |
$220.00 |
Dec 9/36 |
5279 |
TILBURY |
INSTALL ELECTRIC MARKER LAMPS AT TRACK PANS |
May 20/37 |
$460.00 |
Dec 9/36 |
5280 |
WEST LORNE |
INSTALL ELECTRIC MARKER LAMPS AT TRACK PANS |
May 18/37 |
$460.00 |
Dec 9/36 |
5281 |
TILLSONBURG |
INSTALL ELECTRIC MARKER LAMPS AT TRACK PANS |
May 25/37 |
$460.00 |
Dec 9/36 |
5282 |
FORKS CREEK |
INSTALL ELECTRIC MARKER LAMPS AT TRACK PANS |
May 29/37 |
$460.00 |
Dec 17/36 |
5292 |
WATERFORD |
INSTALL ELECTRIC MARKER LAMPS AT TRACK PANS |
May 27/37 |
$460.00 |
Jan 5/37 |
5294 |
FARGO |
INSTALL WIGWAGS AND BELLS IN LIEU OF THE PRESENT LIGHTNING FLASH SIGNALS AT HUFFMAN ROAD |
Feb 12/37 |
$600.00 |
Jan 5/37 |
5295 |
FARGO |
INSTALL WIGWAGS AND BELLS IN LIEU OF THE PRESENT LIGHTNING FLASH SIGNALS AT CENTRE LINE ROAD |
Feb 9/37 |
$600.00 |
Jan 5/37 |
5296 |
BUXTON |
INSTALL WIGWAGS AND BELLS IN LIEU OF THE PRESENT LIGHTNING FLASH SIGNALS AT 8th CONCESSION ROAD |
Feb 11/37 |
$600.00 |
Jan 5/37 |
5297 |
SHEDDEN |
INSTALL WIGWAGS AND BELLS IN LIEU OF THE PRESENT LIGHTNING FLASH SIGNALS AT FROME ROAD |
Feb 4/37 |
$600.00 |
Jan 5/37 |
5298 |
CHARING CROSS |
INSTALL WIGWAGS AND BELLS IN LIEU OF THE PRESENT LIGHTNING FLASH SIGNALS AT DRURY SIDE ROAD |
Feb 1037 |
$600.00 |
Jan 5/37 |
5299 |
AYLMER |
INSTALL WIGWAGS AND BELLS IN LIEU OF THE PRESENT LIGHTNING FLASH SIGNALS AT CONCESSION ROAD |
Feb 3/37 |
$600.00 |
Jan 6/37 |
5300 |
SPRINGFIELD |
INSTALL WIGWAGS AND BELLS IN LIEU OF THE PRESENT LIGHTNING FLASH SIGNALS AT TOWN LINE ROAD |
Feb 2/37 |
$600.00 |
Jan 6/37 |
5301 |
BROWNSVILLE |
INSTALL WIGWAGS AND BELLS IN LIEU OF THE PRESENT LIGHTNING FLASH SIGNALS AT MIDDLE TOWN LINE ROAD |
Feb 1/37 |
$600.00 |
Jan 6/37 |
5303 |
FARGO |
INSTALL ELECTRIC SERVICE & MOTOR AT PUMP HOUSE |
May 4/37 |
$830.00 |
Feb 4/37 |
5312 |
WEST LORNE |
MOVE EASTBOUND TAKE SIDING SIGNAL FROM SIGNAL #1414 TO SIGNAL #1432 |
Feb 8/37 |
$338.00 |
Mar 16/37 |
5321 |
ESSEX |
INSTALL TAKE SIDING SIGNAL ON SIGNAL #2114 |
Mar 19/37 |
$482.00 |
Mar 16/37 |
5322 |
BUXTON |
RETIRE TAKE SIDING SIGNAL FROM SIGNAL #1753 |
Mar 16/37 |
|
Mar 18/37 |
5323 |
BROOKFIELD |
SPUR TRACK AT BROOKFIELD TO BE REMOVED - REMOVE SWITCH-CONNECTED DERAIL |
Mar 23/37 |
|
Apr 5/37 |
5327 |
LYTHMORE |
REMOVAL OF TRACKS FORMERLY SERVING GYPSUM, LIME & ALABASTINE CANADA LTD AT LYTHMORE - REMOVE DERAIL |
May 26/37 |
|
May 28/37 |
5340 |
ALVINSTON |
REMOVE TRAIN ORDER SIGNAL AT ALVINSTON |
Sep 28/37 |
$26.00 |
May 28/37 |
5341 |
COURTRIGHT |
REMOVE TRAIN ORDER SIGNAL AT COURTRIGHT |
Sep 30/37 |
$26.00 |
May 28/37 |
5342 |
MELBOURNE |
REMOVE TRAIN ORDER SIGNAL AT MELBOURNE |
Sep 27/37 |
$26.00 |
May 28/37 |
5343 |
OIL CITY |
REMOVE DOUBLE ARM TRAIN ORDER SIGNAL AT OIL CITY |
Sep 29/37 |
$26.00 |
May 28/37 |
5344 |
PETROLIA |
REMOVE DOUBLE ARM TRAIN ORDER SIGNAL AT PETROLIA |
Sep 30/37 |
$26.00 |
May 28/37 |
5345 |
CHIPPAWA |
REMOVE DOUBLE ARM TRAIN ORDER SIGNAL AT CHIPPAWA |
Sep 8/37 |
$26.00 |
Jul 15/37 |
5362 |
DUTTON |
REMOVAL OF A CROSSOVER AND INSTALLATION OF TRAILING POINT SWITCH ON THE NORTH SPUR TRACK AT DUTTON |
Jul 19/37 |
|
Aug 6/37 |
5371 |
EDWARDS |
REMOVE STUB END OF THE EASTBOUND PASSING TRACK AT EDWARDS |
Sep 20/37 |
|
Aug 9/37 |
5376 |
WELLAND TO MONTAGUE |
WESTERN UNION HAVE AUTHORITY TO REBUILT THE POLE LINE FROM WELLAND TO ONE MILE WEST OF MONTAGUE. THIS INCLUDES REBUILDING OF THE POLE LINE ON THE SOUTH SIDE OF THE TRACKS BETWEEN WELLAND DRAWBRIDGE AND WELLAND CROSSING |
Jan 23/39 |
$600.00 |
Sep 23/37 |
5382 |
ATTERCLIFFE |
REMOVAL OF THE SIDETRACK AND THE INSTALLATION OF A SWITCH IN THE EASTBOUND MAIN TRACK AT ATTERCLIFFE |
Oct 21/37 |
|
Sep 28/37 |
5386 |
NIAGARA JUNCTION |
REMOVAL OF NORTH PASSING TRACK SWITCH AT NIAGARA JUNCTION . THE EAST SWITCH OF THE PASSING SIDING TRACK SERVED AS A DERAIL FOR THE 'SCHOOL HOUSE TRACK' AND IT WILL NOW BE NECESSARY TO INSTALL A SWITCH CONNECTED DERAIL IN ITS PLACE. |
Oct 8/37 |
$267.00 |
Oct 5/37 |
5390 |
ATTERCLIFFE |
REMOVAL OF NORTH SIDING AT ATTERCLIFFE |
Sep 13/37 |
|
Jan 8/38 |
5419 |
WELLAND |
AT PLYMOUTH ROAD - WELLAND - INSTALL AUTOMATIC CROSSING GATES AND WIGWAG SIGNALS. INSTALL ONE MODEL #11 GATE AND GATE ARM MECHANISM OF THE WESTERN RAILWAY SUPPLY COMPANY COMPLETE WITH REFLECTOR BUTTONS BE ATTACHED TO EACH BELL POST. THE GATES TO BE OPERATED AUTOMATICALLY IN CONJUNCTION WITH THE BELLS AND WIGWAGS |
Jun 14/38 |
|
Feb 11/38 |
5426 |
ST. THOMAS |
INSTALL STANDARD HAYES DERAIL OPERATED FROM A SEPARATE SWITCH STAND AT MICHIGAN CENTRAL EXPENSE ON THE TRACK SERVING THE ST. THOMAS METAL SIGNS LTD AND THE THE SO-CALLED MARKET SPUR AT ST. THOMAS |
Feb 2/38 |
|
Mar 4/38 |
5431 |
MONTAGUE TO CANFIELD JUNCTION |
WESTERN UNION HAVE AUTHORITY TO REBUILT THE POLE LINE FROM ONE MILE WEST OF MONTAGUE TO CANFIELD JUNCTION |
Aug 12/39 |
$3250.00 |
Jun 28/38 |
5453 |
LASALETTE |
RETIREMENT OF INTERLOCKING PLANT AT LASALETTE. OPERATION SUSPENDED MAY 1, 1934. LINE REMOVED IN 1935 AND THE INTERLOCKING PLANT AND TRAIN ORDER SIGNALS SHOULD BE RETIRED. WHEN THIS PLANT WAS ABANDONED TO INSTALL AND EASTBOUND AND A WESTBOUND TAKE-SIDING SIGNAL ON MASTS OF AUTOMATIC BLOCK SIGNALS |
Jul 28/38 |
$1882.00 |
Jul 7/38 |
5454 |
STEVENSVILLE |
REMOVE CROSSOVER AT STEVENSVILLE |
Jun 29/38 |
|
Aug 21/38 |
5464 |
DUFFERIN |
REMOVAL OF THE CROSSOVER BETWEEN STATION STAKES 2719 AND 2721 ON THE MAIN LINE AT DUFFERIN |
Sep 1/38 |
|
Oct 19/38 |
5470 |
KINGSMILL |
REMOVAL OF THE CROSSOVER AND SPUR AT KINGSMILL |
Nov 11/38 |
|
Oct 19/38 |
5474 |
ESSEX |
REMOVAL OF THE CROSSOVER AT ESSEX |
Oct 13/38 |
|
Oct 27/38 |
5486 |
RIDGETOWN |
REMOVAL OF THE CROSSOVER AT RIDGETOWN |
Oct 27/38 |
|
Oct 27/38 |
5488 |
ST. THOMAS |
REMOVAL OF THE CROSSOVER AT TALBOT ROAD ST. THOMAS. THE WORK OF REMOVING EAST END OF PIT TRACKS WILL BE DEFERRED |
Nov 1/38 |
|
Nov 11/38 |
5492 |
NIAGARA FALLS |
CONSTRUCTION OF REFUSE TRACK AT NIAGARA FALLS FOR THE NORTH AMERICAN CYANAMID COMPANY |
Dec 16/38 |
|
Nov 29/38 |
5493 |
ST. THOMAS |
REMOVAL OF PIT TRACKS EAST OF ST. THOMAS. FACING POINT SWITCH LOCATED 2000 FEET EAST OF SIGNAL 1141 TO BE REMOVED |
Nov 14/38 |
|
Nov 29/38 |
5494 |
TOWNSEND |
REMOVAL OF THE SIDETRACK ADJACENT TO THE EASTBOUND MAIN TRACK AT TOWNSEND. WORK HAS BEEN DEFERRED FOR THE PRESENT ALTHOUGH THE SWITCH HAS BEEN REMOVED |
Nov 15/38 |
|
Dec 6/38 |
5518 |
FORT ERIE |
TRAIN ORDER SIGNAL PIPE IS UNDER THE DEPOT AND DIFFICULT TO MAINTAIN AND PREVENT FROM FREEZING. AUTHORITY TO RELOCATE THIS SIGNAL IN LIEU OF REBUILDING PIPE LINE. SIGNAL MOVED TO SUITABLE POINT IN FRONT OF TELEGRAPH OFFICE |
Dec 22/38 |
$60.00 |
Dec 7/38 |
5519 |
MONTROSE |
REMOVAL OF STANLEY STREET SWITCH AND OTHER TRACK CHANGES AT MONTROSE YARD |
May 17/39 |
|
Jan 16/39 |
5535 |
MONTROSE |
REMOVAL OF THE MAIN LINE CROSSOVER AT THE CHIPPAWA CREEK ROAD WEST OF MONTROSE YARD |
Jan 20/39 |
|
Jan 16/39 |
5538 |
VICTORIA YARD |
REMOVAL OF YARD TRACKS AND CROSSOVERS IN VICTORIA YARD |
Feb 8/39 |
|
Jan 31/39 |
5542 |
WINDSOR |
PROPOSED CHEMICAL TREATMENT FOR WATER SUPPLIED TO LOCOMOTIVES AT VARIOUS WATER STATION IN CANADA. THE DEARBORN CHEMICAL COMPANY AGREES TO PROVIDE THE NECESSARY EQUIPMENT FOR MIXING AND EJECTING THE PROPER AMOUNT OF CHEMICAL SOLUTION INTO OUR WATER SUPPLY. |
Nov 23/39 |
|
Jan 31/39 |
5543 |
TILBURY |
PROPOSED CHEMICAL TREATMENT FOR WATER SUPPLIED TO LOCOMOTIVES AT VARIOUS WATER STATION IN CANADA. THE DEARBORN CHEMICAL COMPANY AGREES TO PROVIDE THE NECESSARY EQUIPMENT FOR MIXING AND EJECTING THE PROPER AMOUNT OF CHEMICAL SOLUTION INTO OUR WATER SUPPLY. |
Nov 24/39 |
|
Jan 31/39 |
5544 |
WEST LORNE |
PROPOSED CHEMICAL TREATMENT FOR WATER SUPPLIED TO LOCOMOTIVES AT VARIOUS WATER STATION IN CANADA. THE DEARBORN CHEMICAL COMPANY AGREES TO PROVIDE THE NECESSARY EQUIPMENT FOR MIXING AND EJECTING THE PROPER AMOUNT OF CHEMICAL SOLUTION INTO OUR WATER SUPPLY. |
Nov 25/39 |
|
Jan 31/39 |
5545 |
ST. THOMAS |
PROPOSED CHEMICAL TREATMENT FOR WATER SUPPLIED TO LOCOMOTIVES AT VARIOUS WATER STATION IN CANADA. THE DEARBORN CHEMICAL COMPANY AGREES TO PROVIDE THE NECESSARY EQUIPMENT FOR MIXING AND EJECTING THE PROPER AMOUNT OF CHEMICAL SOLUTION INTO OUR WATER SUPPLY. |
Nov 27/39 |
|
Jan 31/39 |
5546 |
WATERFORD |
PROPOSED CHEMICAL TREATMENT FOR WATER SUPPLIED TO LOCOMOTIVES AT VARIOUS WATER STATION IN CANADA. THE DEARBORN CHEMICAL COMPANY AGREES TO PROVIDE THE NECESSARY EQUIPMENT FOR MIXING AND EJECTING THE PROPER AMOUNT OF CHEMICAL SOLUTION INTO OUR WATER SUPPLY. |
Nov 31/39 |
|
Jan 31/39 |
5547 |
FORKS CREEK |
PROPOSED CHEMICAL TREATMENT FOR WATER SUPPLIED TO LOCOMOTIVES AT VARIOUS WATER STATION IN CANADA. THE DEARBORN CHEMICAL COMPANY AGREES TO PROVIDE THE NECESSARY EQUIPMENT FOR MIXING AND EJECTING THE PROPER AMOUNT OF CHEMICAL SOLUTION INTO OUR WATER SUPPLY. NOTE: BUILDING NOTE ERECTED AND WATER TREATMENT EQUIPMENT INSTALLED IN PUMP HOUSE |
Nov 30/39 |
|
Mar 3/39 |
5552 |
WELLAND |
TH&B IS TAKING UP COYLE YARD AT WELLAND. REMOVAL OF OUR CONNECTION - LEAD TRACK TO YARD "A" |
Mar 28/39 |
|
Mar 29/39 |
5558 |
WINDSOR |
REMOVAL OF TRACK ORIGINALLY INSTALLED FOR THE PARKING OF CPR SLEEPERS BETWEEN TECUMSEH AND THE DEPOT. |
Mar 31/39 |
|
Apr 5/39 |
5564 |
MAINLINE |
SIGNAL WORK NECESSITATED BY THE 1939 NEW RAIL MAINTENANCE PROGRAM. ALL WORK IS ON THE EASTBOUND MAIN AT THE FOLLOWING LOCATIONS: EDWARDS 43.22 TO 44.00 - HAGERSVILLE 55.56 TO 56.45 - TILLSONBURG 91.56 TO 96.40 - FARGO 167.51 TO 172.39 - TILBURY 189.59 TO 193.25 - NIAGARA FALLS 0.06 TO 0.19 - ST. THOMAS 113.50 TO 114.48 |
Oct 20/39 |
|
Apr 10/39 |
5568 |
VICTORIA PARK |
TRACK CHANGES REQUESTED BY THE CANADIAN SHREDDED WHEAT COMPANY AT VICTORIA PARK. SWITCH STAND HAYES DERAILS SHOULD BE INSTALLED ON BOTH TRACKS NORTH OF LEWIS AVENUE. |
Apr 25/39 |
|
Apr 26/39 |
5569 |
MONTAGUE |
REMOVAL OF SIDETRACK AT MONTAGUE AS AGREEMENT WITH COUNTY OF WELLAND, DATED APRIL 1, 1926 IS TO BE TERMINATED ON MAY 10, 1939. |
May 13/39 |
|
Apr 26/39 |
5570 |
RUSCOMB |
REMOVAL OF TRAIN ORDER SIGNAL AT RUSCOMB |
Jun 3/39 |
|
Apr 26/39 |
5571 |
IONA |
REMOVAL OF TRAIN ORDER SIGNAL AT IONA |
Jun 3/39 |
|
Aug 10/39 |
5608 |
LEAMINGTON |
INSTALLATION OF SIDE TRACK AT HEINZ PICKLE AT LEAMINGTON |
Aug 11/39 |
|
Aug 14/39 |
5609 |
WOODSLEE TO ESSEX |
WESTERN UNION HAVE AUTHORITY TO REBUILT THE POLE LINE FROM WOODSLEE TO ESSEX |
Feb 29/40 |
|
Aug 31/39 |
5617 |
WINDSOR |
IMMEDIATE WORK IS NECESSARY TO TRAIN OPERATION AT WINDSOR ON ACCOUNT OF THE RECENT FIRE AT TOWER #1 |
Sep 20/39 |
|
Oct 19/39 |
5651 |
BUXTON |
REMOVAL OF THE NORTH PASSING TRACK AT BUXTON. THE EAST SWITCH WAS REMOVED SOME TIME AGO WITHOUT TRACK ORDER |
Oct 17/39 |
|
Oct 31/39 |
5659 |
RIDGETOWN |
AT RIDGETOWN - TAKE UP SOUTH PASSING TRACK - SHORTEN EAST END OF NORTH PASSING TRACK - TAKE UP SPUR TRACK SOUTH OF FREIGHT HOUSE |
Nov 11/39 |
|
Nov 6/39 |
5663 |
TILBURY |
REMOVAL OF SPUR TRACK LEADING OFF THE WEST END OF THE NORTH PASSING TRACK AT TILBURY |
Nov 4/39 |
|
Dec 11/39 |
5677 |
MAIDSTONE |
SHORTEN ELEVATOR AND TEAM TRACK AT MAIDSTONE - M.P. NIAGARA FALLS 215. THE SWITCH IN THE MAIN TRACK IS TO BE MOVED EASTWARD 1100 FEET |
Dec 18/39 |
|
Dec 18/39 |
5682 |
ST. THOMAS |
MAKE ELECTRICAL CONNECTIONS TO 10' X 26' SECTION BUNK HOUSE WHICH IS TO REPLACE THE OLD SWITCHMEN'S HOUSE AT ROSS ST. - ST. THOMAS |
Dec 29/39 |
|
Jan 22/40 |
5693 |
ATTERCLIFFE |
INSTALL DERAIL REMOVED FROM THE SPUR TRACK AT MONTAGUE ON THE SPUR TRACK AT ATTERCLIFFE |
Jan 25/40 |
$15.00 |
Feb 17/40 |
5700 |
MONTROSE |
MAKE CIRCUIT CHANGES TO WESTBOUND SIGNAL #33 AND WESTBOUND SIGNAL #52 AT MONTROSE IN ORDER TO MAKE THEM HARMONIZE WITH THE SIGNAL ASPECTS INDICATIONS AND RULES AS SHOWN IN CANADA DIVISION TIMETABLE |
Mar 20/40 |
$155.25 |
Feb 12/40 |
5701 |
ST. THOMAS |
MAKE CIRCUIT CHANGES AT ST. THOMASTO MAKE THEM HARMONIZE WITH THE SIGNAL ASPECTS INDICATIONS AND RULES AS SHOWN IN CANADA DIVISION TIMETABLE. AT BX TOWER, SIGNALS 2,5 WESTBOUND TWO ARM SIGNAL LOCATED ON THE BRACKET MAST GOVERNING MOVEMENTS OUT OF THE YARD AT ST. THOMAS, MAKE TOP ARM FIXED UNIT AND LOWER ARM 3 POSITION, GREEN TO WEST BOUND MAIN LINE. AT BALL, WESTBOUND SIGNAL #1141 CHANGE MIDDLE LIGHT UNIT FROM AN OPERATIVE TO A FIXED UNIT AND FOR MOVEMENTS INTO THE YARD THE INDICATION WILL BE IN ACCORDANCE WITH RULE 290 - PROCEED AT RESTRICTED SPEED. |
Jul 12/40 |
$343.00 |
Feb 27/40 |
5705 |
WINDSOR/DETROIT |
RETIRE SIGNAL G, A WESTBOUND SIGNAL NEAR THE DETROIT SHAFT OF THE TUNNEL WHICH IS NO LONGER REQUIRED AND DOES NOT CONFORM TO OUR PRESENT RULES. RETIRE SIGNALS A & B EASTBOUND SIGNALS EAST OF THE INTERNATIONAL BOUNDARY LINE. |
Jul 22/40 |
$30.00 |
Feb 27/40 |
5706 |
FARGO TO FLETCHER |
RECONSTRUCTION OF POLE LINE FROM FARGO TO 1.5 MILES WEST OF FLETCHER |
Dec 14/40 |
$1500.00 |
Mar 13/40 |
5718 |
ATTERCLIFFE |
TH&B REQUESTS REMOVAL OF DERAILS AT THE CROSSING OF THE NEW YORK CENTRAL NEAR DILTZ - KNOWN AS E&O CROSSING ATTERCLIFFE. |
Mar 25/40 |
$200.00 |
Mar 22/40 |
5721 |
WELLAND |
AUTHORIZE TH&B TO MAKE THE TOP ARM OF SIGNAL NUMBERED 3 AND 4, GOVERNING MOVEMENTS FROM THE TH&B TO MC A FIXED UNIT AND TO MAKE THE LOWER ARM A THREE-POSITION UNIT. WHEN THIS CHANGE IS MADE SIGNALS WILL CONFORM TO NYC STANDARD RULES. |
Jul 12/40 |
$60.00 |
Apr 22/40 |
5728 |
WINDSOR |
CONSOLIDATION OF INTERLOCKERS 1 & 2 AT WINDSOR - ARRANGE FOR THIRD RAIL INSTALLATIONS & CHANGES IN CONNECTION WITH THIS CONSOLIDATION |
Oct 21/41 |
$148550.00 |
Apr 23/40 |
5731 |
WINDSOR/DETROIT |
PROTECT THE SIGNAL AND ELECTRIC INTERLOCKER SYSTEMS IN THE ELECTRIC ZONE AT DETROIT & WINDSOR AGAINST DAMAGE DUE TO CONTACT OF SIGNAL CIRCUITS WITH HIGH VOLTAGE D.C. PROPULSION CURRENT. |
Oct 9/40 |
$2035.00 |
Apr 29/40 |
5733 |
MONTROSE |
APPROVAL JUNE 5, 1939 TO CONVERT MONTROSE DRAWBRIDGE INTO FIXED SPAN. THE INTERLOCKING PLANT IS NO LONGER REQUIRED AND SHOULD BE RETIRED. HOME AND DISTANT INTERLOCKING SIGNALS WERE CHANGED TO AUTOMATIC BLOCK SIGNALS. |
Jun 15/40 |
|
May 14/40 |
5739 |
NIAGARA FALLS |
CANADA CUSTOMS OFFICE BUILDING TO BE ENLARGED BY 10' WESTWARD NECESSITATING THE RELOCATION OF A RELAY BOX |
May 29/40 |
$76.50 |
Jun 6/40 |
5748 |
FRASER |
INSTALLATION OF AN INDUSTRIAL TRACK AT FRASER. THE SWITCH TO BE LOCATED ON EASTBOUND TRACK 560 FEET EAST OF TOWN LINE |
Jun 8/40 |
|
Jun 25/40 |
5753 |
MONTROSE |
MOVE SIGNAL #33 APPROXIMATELY 1000 FEET EASTWARD AND TO REMOVE SIGNAL #31 THIS PROVDING BETTER SPACING AND ALLOWING TRAINS TO CROSSOVER FROM WESTBOUND TO EASTBOUND YARD WITHOUT ENTERING THE BLOCK EAST OF SIGNAL #33 |
Jul 4/40 |
$512.00 |
Jun 25/40 |
5754 |
WELLAND |
MAKE A NUMBER OF SIGNAL CHANGES AT CANADIAN NATIONAL CROSSING WELLAND |
Jul 4/40 |
|
Jul 6/40 |
5759 |
STEVENSVILLE & MONTROSE |
ON ACCOUNT OF CONSTRUCTION OF QEW BRIDGES AND WIDENING OF HIGHWAY - IT IS NECESSARY TO MOVE SIGNAL E-132 TO A POINT ABOUT 150 FEET WEST OF ITS PRESENT LOCATION EAST OF STEVENSVILLE AND TO PLACE SIGNAL LINE WIRES IN A TEMPORARY UNDERGROUND CABLE WHERE THIS HIGHWAY CROSSES OUR TRACKS EAST OF STEVENSVILLE ON THE FORT ERIE BRANCH AND ALSO WEST OF MONTROSE DRAWBRIDGE ON THE MAINLINE |
Jul 13/40 |
|
Jul 12/40 |
5768 |
AIR LINE CROSSING |
INSTALL FLOODLIGHTS ON EACH SIDE OF THE CROSSING OF HIGHWAY #3 WEST OF AIR LINE CROSSING ON THE ST. CLAIR BRANCH. FLOODLIGHTS ARE TO BE AUTOMATICALLY OPERATED BY A SHORT TRACK CIRCUIT AND INSTALLED IN ACCORDANCE TO STANDARD HIGHWAY CROSSING SIGNALS |
Sep 27/40 |
$627.00 |
Jul 19/40 |
5771 |
WINDSOR |
WESTERN UNIT HAS AUTHORITY TO CONSTRUCT APPROXIMATELY ONE MILE OF POLE LINE EAST OF TOWER 4 WINDSOR |
Aug 10/40 |
$125.00 |
Oct 11/40 |
5802 |
ST. THOMAS |
REMOVE F.W. SUTHERLAND TRACK |
Oct 17/40 |
|
DEC 16/40 |
5822 |
RIDGETOWN TO FARGO |
RECONSTRUCTION OF WESTERN UNION POLE LINE |
Jul 5/41 |
$5850.00 |
Mar 8/41 |
5842 |
VICTORIA |
INSTALL SA ON AUTOMATIC SIGNAL E-154 FOR SPEED RESTRICTION TO 45 MPH |
Mar 13/41 |
$200.00 |
May 8/41 |
5857 |
NIAGARA FALLS |
REMOVEAL OF TRAIN ORDER SIGNAL AT NIAGARA FALLS ON NIAGARA BRANCH |
May 17/41 |
|
Jun 17/41 |
5868 |
WINDSOR YARD |
INSTALL INSULATION, BONDS & GROUND CONNECTIONS TO INSULATE EAST END OF TRACKS 2 & 3 WESTBOUND REPAIR YARD AT WINDSOR FOR A DISTANCE OF 2 CAR LENGTHS EACH TRACK |
Jul 30/41 |
$155.00 |
Jun 18/41 |
5870 |
NIAGARA BRANCH |
RETIREMENT OF ALL SIGNAL EQUIPMENT ON NIAGARA BRANCH BETWEEN NIAGARA JCT. & CHIPPAWA |
Aug 30/41 |
|
Jul 8/41 |
5878 |
WATERFORD TO HAWTREY |
RECONSTRUCTION OF POLE LINE WATERFORD TO HAWTREY |
Apr 20/42 |
$6520.00 |
Aug 13/41 |
5892 |
STEVENSVILLE |
INSTALLATION OF MAIN LINE CROSSOVER AT STEVENSVILLE |
Aug 12/41 |
|
Sep 11/41 |
5907 |
HAGERSVILLE |
4 MILES WEST OF HAGERSVILLE - CONSTRUCTION OF NEW TRACK TO SERVE RCAF AIR FIELD |
Dec 10/41 |
|
Oct 10/41 |
5930 |
ST. DAVID'S |
REMOVE TRAIN ORDER SIGNAL AT ST. DAVID'S |
Oct 28/41 |
|
Nov 12/41 |
5948 |
TAYLOR |
ACCOUNT OF WIDENING TOWN LINE ROAD AT TAYLOR - RELOCATE WIGWAG SIGNALS |
Nov 20/41 |
|
Nov 14/41 |
5951 |
WELLAND |
REMOVAL OF MAIN LINE CROSSOVER ABOUT 150 FT WEST OF KING ST. ( FORMERLY MAIN ST. ) |
Nov 17/41 |
|
Nov 27/41 |
5961 |
FLETCHER TO WOODSLEE |
RECONSTRUCTION OF POLE LINE BETWEEN FLETCHER & WOODSLEE |
Apr 6/43 |
$10000.00 |
Jan 16/42 |
6000 |
MAINLINE |
REMOVE DERAILS AT FOLLOWING LOCATIONS: ESSEX - HAYES DERAIL AT ELEVATOR TRACK AND COAL YARD TRACK. TILBURY - DERAIL OFF EASTBOUND MAIN TO PLANT #1 CANADIAN TOP & BODY CORP, DERAIL OFF WESTBOUND MAIN TO PLANT #2 CANADIAN TOP & BODY CORP AND DERAIL OFF EASTBOUND MAIN TO TILBURY CANNING. BUXTON - DERAIL ON STOCK YARD TRACK OFF EASTBOUND PASSING TRACK. WEST LORNE - TRACK OFF WESTBOUND MAIN TO ERIE FLOORING & WOOD PRODUCTS. FORKS CREEK - DERAIL ON SPUR TO PUMPHOUSE OFF WESTBOUND MAIN. WATERFORD - DERAIL ON TRACK TO CANADIAN CANNERS. NIAGARA FALLS - DERAIL ON TRACK TO JAMES BARCLAY & CO. AND HAYES DERAIL ON TRACK SERVING MEANS COAL CO & GALLOWAY COAL CO. |
Jan 21/42 |
|
Mar 20/42 |
6020 |
APPIN |
INSTALL FIXED ARMS ON HOME SIGNALS ON MCRR AT APPIN |
Mar 23/42 |
$25.00 |
Mar 24/42 |
6021 |
IONA |
REMOVE PIPE-CONNECTED DERAIL ON THE STOCK YARD SPUR OFF THE EAST END OF THE SOUTH PASSING TRACK AT IONA |
Mar 27/42 |
$8.00 |
Mar 25/42 |
6023 |
ST. THOMAS |
REMOVAL OF MC-L&PS CROSSOVER EAST OF BX INTERLOCKING TOWER, ST. THOMAS. RETIRE DWARF SIGNAL #21 |
Apr 1/42 |
|
Mar 25/42 |
6024 |
WINDSOR |
REMOVE SIDING SERVING IMPERIAL OIL CO. AT WINDSOR |
Jun 23/42 |
|
May 6/42 |
6042 |
ST. THOMAS |
BOND, INSULATE & GROUND SECTION OF OLD ICE HOUSE TRACK EAST OF THE STATION AT ST. THOMAS FOR UNLOADING GASOLINE |
May 13/42 |
$57.00 |
Sep 14/42 |
6110 |
IONA TO RODNEY |
RECONSTRUCTION OF WESTERN UNION POLE LINE BETWEEN IONA AND RODNEY |
Feb 12/44 |
$6900.00 |
Nov 21/42 |
6143 |
ST. THOMAS |
SIGNAL CHANGES RELATING TO REMOVAL OF 4 DERAILS AND REPLACEMENT OF EASTWARD HOME SIGNAL AT BX INTERLOCKING |
Dec 31/42 |
|
Feb 15/43 |
6168 |
HAGERSVILLE |
ADDITIONAL PROTECTION FOR MOVEMENTS BEING MADE AGAINST THE CURRENT OF TRAFFIC ON THE EASTBOUND TRACK FROM HAGERSVILLE TO THE QUARRY SWITCH ABOUT ONE MILE WEST OF HAGERSVILLE. |
Feb 23/43 |
|
Apr 9/43 |
6179 |
MONTROSE |
INSTALLATION OF FACING POINT CROSSOVER BETWEEN THE WESTBOUND MAIN TRACK AND TAILOUT SWITCHING TRACK OF THE SOUTHERLY GROUP IN MONTROSE YARD |
Apr 16/43 |
$220.00 |
Dec 20/43 |
6277 |
ST. THOMAS |
HEAVY REPAIRS TO POLE LINE ST. THOMAS EAST YARD LIMITS - EAST FOR 5 MILES |
Jun 10/44 |
$3520.00 |
Dec 30/43 |
6279 |
NIAGARA FALLS |
DUE TO COMPLAINTS FROM RESIDENTS, CITY OF NIAGARA FALLS HAS REQUESTED THE REMOVAL OF BELLS ON WIGWAG CROSSING SIGNALS AT THE FOLLOWING STREETS: QUEEN ST., HURON ST., ERIE ST., MORRISON ST., SIMCOE ST., ONTARIO AVE & EASTWOOD AVE. |
Dec 31/43 |
|
Jan 18/44 |
6284 |
HAGERSVILLE |
INSTALL ANNUNCIATORS IN GATE TOWER AT MAIN ST. CROSSING |
Mar 9/44 |
$590.00 |
Jan 26/44 |
6287 |
ST. THOMAS |
INSTALL FLASHING LIGHT SIGNALS AT QUEEN ST. |
Nov 8/44 |
|
Jan 26/44 |
6288 |
ST. THOMAS |
INSTALL FLASHING LIGHT SIGNALS AT WILLIAM ST. CROSSING |
May 17/44 |
|
Feb 1/44 |
6290 |
FARGO |
REMOVAL OF MAIN TRACK DERAILS AND ELIMINATION OF HAYES DERAILS #10 AND #11 ON SIDE TRACKS ON MCRR. CHANGE LOCATION OF FIXED DISTANT SIGNAL FROM 1200 FT TO 5280 FT FROM HOME SIGNALS AND CHANGE ONE ARM HOME SIGNAL #6 & #23 TO TWO ARM SIGNAL WITH LOWER ARM INOPERATIVE ON PERE MARQUETTE. |
Feb 29/44 |
|
Apr 8/44 |
6302 |
LASALETTE TO TILLSONBURG |
HEAVY REPAIRS TO POLE LINE BETWEEN LASALETTE & TILLSONBURG. RESPACING POLES FROM 40 TO 53 PER MILE. |
Dec 27/44 |
|
Apr 22/44 |
6304 |
WEST LORNE |
INSTALLATION OF A TRACK CIRCUIT ON SOUTH SIDING AT GRAHAM ST. TO ACTIVATE EXISTING CROSSING PROTECTION |
Apr 27/44 |
$300.00 |
Aug 2/44 |
6332 |
TILLSONBURG TO BROWNSVILLE |
HEAVY REPAIRS TO TILLSONBURG TO BROWNSVILLE |
Oct 16/45 |
|
Oct 4/44 |
6355 |
TILBURY |
INSTALL TAKE SIDING SIGNAL ON THE MAST OF EASTWARD ABS 1894 TO INDICATE TO EASTWARD TRAINS WHEN THEY ARE TO TAKE SIDING AT TILBURY |
Oct 13/44 |
|
Nov 6/44 |
6368 |
ST. THOMAS |
INSTALL FLASHING LIGHT SIGNALS AT WHITE ST. |
Nov 10/44 |
|
Nov 18/44 |
6375 |
HAGERSVILLE |
TRACK CHANGES AT HAGERSVILLE QUARRIES - MOVING MAIN LINE TURNOUT |
Apr 19/45 |
|
Dec 5/44 |
6386 |
TILLSONBURG |
INSTALL TAKE SIDING SIGNAL ON THE MAST OF ABS #914 TO BE OPERATED FROM TILLSONBURG STATION |
Feb 16/45 |
|
Dec 19/44 |
6390 |
ST. THOMAS |
INSTALL FLASHING LIGHT SIGNALS IN LIEU OF EXISTING LIGHTNING FLASH SIGNALS AT METCALF ST. |
Dec 21/44 |
|
Feb 1/45 |
6424 |
HAGERSVILLE |
INSTALLATION OF DETECTOR LOCKING TO REPLACE EXISTING DETECTOR BARS AND THE MODERNIZATION OF THE HOME AND DISTANT SIGNALS ON THE CN TRACK AT HAGERSVILLE |
Feb 23/46 |
|
Feb 23/45 |
6441 |
ST. THOMAS |
INSTALL FLASHING LIGHT SIGNALS IN LIEU OF EXISTING LIGHTNING FLASH SIGNALS AT CHURCH ST. |
Mar 5/45 |
|
Feb 26/45 |
6442 |
ST. THOMAS TO NIAGARA RIVER |
INSTALL DERAILS ON 42 MANUAL TURNOUTS ON MAIN LINE TRACK SWITCHES BETWEEN ST. THOMAS & NIAGARA RIVER |
Apr 27/46 |
$17520.00 |
Mar 12/45 |
6451 |
ST. THOMAS TO SHEDDEN |
HEAVY REPAIRS TO POLE LINE BETWEEN ST. THOMAS & SHEDDEN |
Apr 18/46 |
$7800.00 |
May 8/45 |
6465 |
ESSEX |
REPLACE WIGWAG SIGNALS WITH FLASHING LIGHT SIGNALS & SHORT ARM GATES AT TALBOT ST. |
Sep 30/45 |
|
Jun 15/45 |
6475 |
ST. THOMAS TO WINDSOR |
INSTALL DERAILS ON 36 MANUAL TURNOUTS ON MAIN LINE TRACK SWITCHES BETWEEN ST. THOMAS & WINDSOR |
Mar 26/46 |
|
Jul 17/45 |
6486 |
ST. THOMAS |
REMOVE ENGINE SPUR TRACK AT WEST END OF STATION AND REPLACE WITH OIL HOUSE |
Mar 5/45 |
|
Jul 30/45 |
6488 |
RUSCOMB |
INSTALL FLASHING LIGHT SIGNALS IN LIEU OF EXISTING WIGWAG SIGNALS AT HIGHWAY #2 |
Sep 28/45 |
|
Aug 20/45 |
6510 |
SPRINGFIELD |
INSTALL DISPATCHER CONTROLLED TAKE SIDING SIGNAL ON MAST OF WESTWARD ABS #1001 AND CHANGE PRESENT TAKE SIDING SIGNAL ON MAST SIGNAL #1032 TO DISPATCHER CONTROL |
Aug 22/45 |
|
Aug 29/45 |
6511 |
WINDSOR |
REMOVE SIGNAL AT WEST END OF TRACK #12 NEAR EMPIRE STATE ICE COMPANY |
Aug 30/45 |
|
Sep 17/45 |
6516 |
ESSEX |
CHANGE TAKE SIDING SIGNALS TO DISPATCHER CONTROL FROM STATION CONTROL |
Oct 1/45 |
|
Nov 1/45 |
6535 |
CANFIELD |
REMOVE CN SWITCH AND DERAIL #14, DWARF SIGNAL #11 AND LOWER MECHANICAL ARM OF SIGNAL #31 |
Jan 5/46 |
|
Nov 3/45 |
6536 |
CANFIELD |
REMOVE MAIN TRACK DERAILS #4, #16, #17 AND #23. CHANGE DWARF SIGNALS #2 & #28 FROM MECHANICAL DWARF SIGNALS TO colour LIGHT SIGNALS. |
Aug 30/46 |
|
Nov 1/45 |
6537 |
CANFIELD |
REMOVE DERAILS #19 & #32. INSTALL DIRECTIONAL STICK LOCKING. CHANGE HOME SIGNALS #11 & #31 WIRE-CONNECTED MECHANICAL HOME SIGNALS WITH colour LIGHT SIGNALS. CHANGE DISTANT SIGNALS #10 & #32 WIRE-CONNECTED MECHANICAL DISTANT SIGNALS WITH colour LIGHT SIGNALS. |
Aug 30/46 |
|
Nov 2/45 |
6538 |
CANFIELD |
REMOVE DERAILS #18 & #26. INSTALL DIRECTIONAL STICK LOCKING. CHANGE HOME SIGNALS #8 & #27 WIRE-CONNECTED MECHANICAL HOME SIGNALS WITH colour LIGHT SIGNALS. CHANGE DISTANT SIGNALS #7 & #33 WIRE-CONNECTED MECHANICAL DISTANT SIGNALS WITH colour LIGHT SIGNALS LOCATED 6500 FEET FROM HOME SIGNALS. |
Aug 30/46 |
|
Nov 29/45 |
6550 |
WATERFORD |
RELOCATION OF CROSSOVER WEST OF STATION |
Dec 19/45 |
|
Dec 4/45 |
6553 |
ST. THOMAS |
THE SWITCH OFF THE #1 TRACK AT THE EAST END OF ST. THOMAS YARD BE MOVED OFF THE YARD LEAD AND INSTALLED IN THE #2 TRACK. |
Dec 6/45 |
|
Dec 5/45 |
6554 |
WINDSOR |
REMOVE SIGNAL GOVERNING EASTWARD TRAIN MOVEMENTS ON TRACK #10 AT THE WEST END OF THE ICE HOUSE PLATFORM |
Dec 13/45 |
|
Mar 16/46 |
6577 |
WINDSOR TO MAIDSTONE |
HEAVY REPAIRS TO POLE LINE FROM WINDSOR TO MAIDSTONE |
Jan 31/47 |
$7750.00 |
Jul 11/46 |
6615 |
ST. THOMAS |
REPLACE SEMAPHORE SIGNAL AT BX TOWER WITH colour LIGHT SIGNAL |
Nov 26/46 |
$3150.00 |
Aug 5/46 |
6624 |
SPRINGFIELD TO YARMOUTH |
HEAVY REPAIRS TO POLE LINE BETWEEN SPRINGFIELD & YARMOUTH |
Jun 7/47 |
$7425.00 |
Aug 21/46 |
6632 |
PELTON |
INSTALL FLASHING LIGHT SIGNALS TO REPLACE WIGWAG SIGNALS AT WALKER RD. CROSSING |
Sep 26/46 |
$680.00 |
Oct 12/46 |
6657 |
CANFIELD |
REPLACE EXISTING WIGWAG SIGNALS WITH FLASHING LIGHT SIGNALS AT HIGHWAY #3 - TALBOT STREET WEST |
Nov 8/46 |
$680.00 |
Oct 17/46 |
6659 |
WINDSOR |
INSTALL MANUALLY CONTROLLED SHORT-ARM GATES & BELLS AT HOWARD AVE. REMOVE PRESENT PNEUMATIC GATES. GATES TO BE OPERATED BY SIGNALMAN IN TOWER 4 |
Mar 20/47 |
$4400.00 |
May 9/47 |
6733 |
ST. THOMAS - BALL |
INSTALL colour LIGHT DWARF SIGNAL ON THE YARD LEAD AND A THREE UNIT colour LIGHT SIGNAL ABOUT 170 FEET WEST OF THE MAIN TRACK SWITCH. INSTALL ELECTRIC LOCKING FOR MAIN TRACK CROSSOVER AND YARD LEAD SWITCH. BOLT-LOCK THE MAIN TRACK CROSSOVER. RETIRE PRESENT EASTWARD SIGNAL 1142. |
Mar 24/48 |
$6666.31 |
Jun 18/47 |
6741 |
FARGO |
INSTALL FLASHING LIGHT SIGNALS AT CROSSING WEST OF FARGO INTERLOCKING TOWER. |
Aug 4/47 |
$2850.00 |
Jul 14/47 |
6752 |
NIAGARA FALLS TO MONTROSE JCT. |
HEAVY REPAIRS TO POLE LINE BETWEEN NIAGARA FALLS AND MONTROSE JCT. 3.72 MILES |
Aug 30/47 |
$1000.00 |
Aug 4/47 |
6759 |
HAGERSVILLE |
INSTALL FLASHING LIGHT SIGNALS AT MAIN ST. CROSSING ( HIGHWAY #6). INSTALL THREE ELECTRIC LIGHTS ON EACH PNEUMATIC GATE IN THE ENTERING LANE OF THE CROSSING AND REMOVE THE GATES ON THE LEAVING LANES. |
Aug 16/47 |
$2880.00 |
Aug 6/47 |
6760 |
WELLAND |
INSTALL TRACK CIRCUIT CONTROL FOR THE PRESENT WIGWAG SIGNALS AT BROADWAY ( PARKER) STREET |
Oct 22/47 |
$3460.00 |
Oct 30/47 |
6808 |
MAINLINE |
INSTALL BOLT-LOCKING AT 47 MAIN TRACK CROSSOVERS |
Dec 4/48 |
$35250.00 |
Mar 23/48 |
6849 |
NIAGARA FALLS |
SERVICE ON NStC&T CEASED ON NOVEMBER 26, 1947. REMOVE INTERLOCKING AT QUEEN ST. CROSSING |
Apr 7/48 |
$70.00 |
Mar 23/48 |
6850 |
VICTORIA PARK |
SERVICE ON NStC&T CEASED ON NOVEMBER 26, 1947. REMOVE INTERLOCKING AT QUEEN ST. CROSSING AND ADD PROTECTION AT MAIN TRACK SWITCH TO AMERICAN CAN CO. |
Apr 6/48 |
$335.00 |
Jun 30/48 |
6878 |
NIAGARA FALLS |
REPLACE WIGWAG SIGNALS AT CLIFTON HILL ROAD WITH FLASHING LIGHT SIGNALS |
Jul 6/48 |
$1370.00 |
Jan 22/49 |
6940 |
PETROLIA |
INSULATE AND BOND THE TRACK LEADING TO OIL COMPANY FROM THE WEST |
Feb 4/49 |
$235.00 |
Feb 24/49 |
6950 |
PERRY |
CHANGE TAKE SIDING SIGNAL FROM OPERATOR TO DISPATCHER CONTROL |
Sep 27/49 |
-$75.00 |
Mar 2/49 |
6951 |
WELLAND |
INSTALL ELECTRIC LOCKS, CIRCUIT CONTROLLERS, PHOTO-ELECTRIC CELL AND ACCESSORIES ON WELLAND DRAWBRIDGE |
Apr 2/49 |
$14000.00 |
Sep 15/49 |
6997 |
FARGO |
INSTALL TRACK CIRCUITS FOR AUTO-MANUAL CONTROL OF WIGWAGS |
Dec 6/49 |
$6300.00 |
Oct 24/50 |
7115 |
FORT ERIE |
INSTALL SWITCH CONNECTED DERAIL TO NEW TRACK SERVING HORTON STEEL |
Dec 5/50 |
|
Nov 9/50 |
7123 |
SOUTHWOLD |
SIGNAL CHANGES AT INTERLOCKING BETWEEN NYC ST. CLAIR BRANCH AND CN |
Feb 26/52 |
|
Nov 21/50 |
7128 |
ESSEX |
INSULATED, BOND & GROUND OF SECTION OF TRACK USED FOR UNLOADING INFLAMMABLE LIQUIDS ON SIDETRACK LEADING TO THE RELIANCE PETROLEUM BULK PLANT FROM THE AMHERSTBURG BRANCH TRACK |
Dec 11/50 |
$200.00 |
May 4/51 |
7183 |
TILBURY |
MAKE ADDITIONS AND ALTERATIONS TO BRIDGE 34.96 WEST OF TILBURY AND INSTALL 2 CROSSOVERS AND SPUR TRACK |
Mar 20/52 |
$3225.00 |
May 22/51 |
7190 |
HAGERSVILLE |
INSTALL HALF ROAD GATES IN PLACE OF EXISTING MANUALLY OPERATED SAFETY GATES AND IMPROVEMENT TO EXISTING FLASHING LIGHT SIGNALS BY ADDITION OF BACK LIGHTS AND A BELL ON THE SOUTH SIDE |
Jan 17/52 |
$23,400.00 |
May 22/51 |
7191 |
HAGERSVILLE |
INSTALL HALF ROAD GATES AND REPLACE EXISTING WIGWAG SIGNALS WITH FLASHING SIGNALS |
Feb 12/52 |
$15700.00 |
May 22/51 |
7192 |
HAGERSVILLE |
INSTALL HALF ROAD GATES IN PLACE OF EXISTING MANUALLY OPERATED SAFETY GATES AND FLASHING LIGHT SIGNALS TO BE MANUALLY OPERATED FROM HAGERSVILLE INTERLOCKING TOWER |
Feb 12/52 |
$9000.00 |
May 23/51 |
7193 |
WELLAND |
INSTALL FLASHING LIGHT SIGNALS AT SIDING LEADING TO PAGE-HERSEY TUBES AT ONTARIO ROAD AND DAIN AVE. |
Jul 6/51 |
$6575.00 |
Aug 30/51 |
7228 |
CHIPPAWA |
INSTALL DERAIL FOR NEW TRACKS INSTALLED FOR HYDRO-ELECTRIC COMMISSION |
Nov 7/51 |
$686.38 |
Sep 14/51 |
7234 |
FORT ERIE |
INSTALL DERAIL ON NEWLY CONSTRUCTION CABOOSE TRACK MAKING CONNECTION TO THE SOUTH LEAD TRACK NORTH OF OUR MAIN LINE TRACKS AT VICTORIA |
Dec 6/51 |
|
Oct 10/51 |
7242 |
VICTORIA PARK |
CHANGES TO TRACK LEADING TO DOMINION CHAIN CO. REQUIRING MOVING RELAY CASE AND DERAIL. |
Nov 2/51 |
$390.00 |
Dec 5/51 |
7269 |
YARMOUTH |
CHANGES TO INTERLOCKING. ON CN - REMOVE DERAILS AND DETECTOR BARS AND REPLACE WITH TRACK CIRCUITS AND DETECTOR LOCKING - CHANGE HOME SIGNALS FROM MECHANICAL TO SEARCHLIGHT TYPE - CHANGE DISTANT SIGNALS TO SEARCHLIGHT TYPE. ON NYC - REMOVE MAIN TRACK DERAILS AND INSTALL ADDITIONAL TRACK CIRCUIT CONTROLLER AND ELECTRIC LEVER LOCK |
Oct 29/52 |
$10535.00 |
Jan 30/52 |
7295 |
IONA |
INSTALL DISPATCHER CONTROLLED TAKE SIDING SIGNAL AND OS SIGNAL ON MAST OF WESTWARD ABS #1263 |
Feb 22/52 |
$175.00 |
Mar 19/52 |
7309 |
FLETCHER |
REMOVE TRAIN ORDER SIGNAL |
Mar 26/52 |
|
Mar 26/52 |
|
FORT ERIE |
REMOVE TRACK ON OLD FORT ERIE BRANCH FROM NIAGARA JCT TO AMIGARI A DISTANCE OF 1.84 MILES. TRACKAGE RIGHTS WITH CN DUNNVILLE SUB STARTING JUNE 6, 1944 BETWEEN AMIGARI AND MAIN LINE AT FORT ERIE. MINOR TRACK REMOVAL IN 1945 WERE CONSIDERED TEMPORARY BUT IT NOW APPEARS THE PRESENT METHOD OF OPERATION WILL CONTINUE FOR A LONG PERIOD OF TIME AND IT IS NOW PROPOSED TO TAKE UP THE UNUSED MAIN TRACK. IT IS INTENDED TO RETAIN THE RIGHT OF WAY AND TO LEAVE IN PLACE THE SHORT PIECES OF TRACK AT THE THREE ROAD CROSSINGS AND CONTINUE TO MAINTAIN THE CROSSINGS AS A PROTECTION IN CASE IT SHOULD SOME DAY BE ADVISABLE TO REVERT TO THE FORMER OPERATION AND REBUILT THE MAIN TRACK. LENGTH OF RAIL TO BE RETIRED IS 1.78 MILES INCLUDING A #16 TURNOUT AT NIAGARA JCT, SIGNAL EQUIPMENT AT TURNOUT. ALSO ABANDON GRADING, ONE BRIDGE AND TWO CULVERTS |
|
-$6850.00 |
Aug 1/52 |
7354 |
ST. THOMAS |
INSTALLATION OF HAYES DERAIL AT SIDE TRACK SERVING THE THOMAS FUEL & ICE CO. AND THE ST. THOMAS BRONZE CO. |
Aug 4/52 |
$112.00 |
Oct 10/52 |
7375 |
WINDSOR |
INSTALL INTERLOCKED POWER SWITCH AT THE CPR INTERCHANGE TO BE OPERATED FROM TOWER 3 IN LIEU OF PRESENT HAND THROWN SWITCH |
Oct 31/52 |
$2400.00 |
Feb 20/53 |
7404 |
BROWNSVILLE |
RELOCATE WIGWAG SIGNALS DUE TO WIDENING OF COUNTY ROAD #31 ( MIDDLE TOWNLINE ) |
Jun 10/53 |
|
Jun 15/53 |
7451 |
ST. THOMAS |
BOND, GROUND & INSULATE SECTION OF SIDE TRACK SERVING ST. THOMAS METAL SIGN LTD. AT CHURCH ST. |
Jun 22/53 |
$280.00 |
Jun 25/53 |
7456 |
SHEDDEN |
REPLACE WIGWAG SIGNALS AT HIGHWAY #3 ONE MILE EAST OF SHEDDEN WITH FLASHING LIGHT SIGNALS |
Jul 20/53 |
$780.00 |
Jul 15/53 |
7466 |
FORT ERIE |
INSTALL DERAIL AT GOULD NATIONAL BATTERIES OF CANADA ON THE OLD FORT ERIE BRANCH |
Jul 23/53 |
$150.00 |
Aug 20/53 |
7490 |
FORKS CREEK, WEST LORNE, TILLSONBURG |
REMOVAL OF WATER TRACK PANS AND RELATED EQUIPMENT AT FORKS CREEK, WEST LORNE AND TILLSONBURG |
Sep 14/53 |
|
Aug 20/53 |
7491 |
WATERFORD & TILBURY |
REMOVAL OF WATER TRACK PANS AND RELATED EQUIPMENT AT WATERFORD & TILBURY |
Sep 21/53 |
|
Sep 2/53 |
7501 |
WINDSOR & DETROIT |
REMOVAL OF THIRD RAIL BETWEEN WINDOW AND DETROIT THROUGH TUNNEL |
Nov 27/53 |
$6865.00 |
Oct 20/53 |
7512-A |
WELLAND |
SIGNAL CHANGES AT WX INTERLOCKING. INSTALL SS CIRCUITS. REMOVE DERAIL |
May 3/54 |
$3575.00 |
Oct 20/53 |
7512-B |
WELLAND |
SIGNAL CHANGES AT WX INTERLOCKING WITH CN. REPLACE DETECTOR BARS WITH TIME AND ROUTE LOCKING ON CN. REPLACE DWARF SIGNAL ON CN. REPLACE HOME SIGNALS ON CN.. REMOVE DERAIL ON CN. |
May 3/54 |
$14500.00 |
Jan 21/54 |
7568 |
BRIGDEN |
REMOVAL OF MANUAL BLOCK SIGNAL |
Feb 5/54 |
$85.00 |
Jan 21/54 |
7569 |
INWOOD |
REMOVAL OF MANUAL BLOCK SIGNAL |
Feb 4/54 |
$85.00 |
Feb 24/54 |
7574 |
TILLSONBURG |
REMOVAL OF TRACK PAN SPUR |
Mar 24/54 |
|
Feb 24/54 |
7575 |
FORKS CREEK |
REMOVAL OF TRACK PAN SPUR |
Mar 11/54 |
|
Feb 24/54 |
7576 |
WATERFORD |
REMOVAL OF TRACK PAN SPUR |
Mar 25/54 |
|
May 6/54 |
7591 |
FORT ERIE |
RELOCATION OF SIGNALS DUE TO CONSTRUCTION OF OVERHEAD VIADUCT |
Jan 5/55 |
$200.00 |
Jun 16/54 |
7600 |
WINDSOR & FARGO |
REMOVE 3RD RAIL CLEARANCE INDICATORS |
Jun 21/54 |
$40.00 |
Aug 4/54 |
7614 |
BUXTON |
RELOCATION OF WIGWAG SIGNALS AT 8TH CONCESSION ROAD |
Mar 16/55 |
$278.00 |
Aug 19/54 |
7618 |
WELLAND |
INSTALLATION OF FLASHING LIGHT SIGNALS AND SHORT ARM GATES AT KING ST. AND INSTALLATION OF FLASHING LIGHT SIGNALS AT PLYMOUTH RD IN LIEU OF WIGWAG SIGNALS |
Jan 13/55 |
|
Dec 6/55 |
7636 |
WELLAND |
CONSTRUCTION OF OVERHEAD BRIDGE AND RETIRING CROSSING PROTECTION AT RACEWAY ST. |
Sep 6/55 |
$8500.00 |
Dec 10/54 |
7642 |
RIDGETOWN |
REMOVAL OF NORTH PASSING TRACK |
Dec 21/54 |
$195.00 |
Dec 10/54 |
7643 |
TAYLOR |
REMOVAL OF SOUTH PASSING TRACK |
Dec 6/54 |
$195.00 |
Dec 10/54 |
7644 |
HIGHGATE |
REMOVAL OF NORTH PASSING TRACK |
Dec 6/54 |
$100.00 |
Dec 23/54 |
7650 |
ST. THOMAS |
REMOVAL OF TRACK LEADING OFF WESTWARD MAIN TRACK EXTENDING EAST ACROSS WHITE ST. AND PRINCESS AVE. |
Nov 18/54 |
|
Jan 28/55 |
7662 |
ST. THOMAS |
REMOVAL OF DERAIL ON TRACK #1 |
Nov 18/54 |
$40.00 |
Feb 7/55 |
7664 |
LASALETTE & SPRINGFIELD |
REMOVAL OF DERAILS ON WESTWARD PASSING TRACKS AT LASALETTE & SPRINGFIELD |
Dec 28/54 |
$320.00 |
Feb 7/55 |
7665 |
ATTERCLIFFE & FRASER |
REMOVAL OF DERAILS AT ATTERCLIFFE & SPRINGFIELD |
Nov 26/54 |
$150.00 |
Feb 11/55 |
7666 |
ST. THOMAS |
REMOVAL OF CROSSOVER BETWEEN WESTWARD MAIN TRACK AND CREDIT VALLEY TRACK AND REMOVAL OF MAIN TO MAIN CROSSOVER 850 FEET EAST OF FIRST AVENUE |
Mar 15/55 |
$413.00 |
Feb 11/55 |
7667 |
NIAGARA FALLS |
REMOVAL OF MAIN TO MAIN CROSSOVER NEAR MORRISON ST. |
Dec 7/54 |
$124.00 |
Apr 1/55 |
7690 |
IONA |
REMOVAL OF EASTBOUND PASSING TRACK AND FORMER STOCK YARD TRACK |
Jun 6/55 |
$170.00 |
Apr 20/55 |
7703 |
BUXTON |
REMOVAL OF PASSING TRACK AND RELOCATION OF SWITCH AND DERAIL FOR TEAM TRACK |
Mar 16/55 |
$625.00 |
Jun 1/55 |
|
WINDSOR |
IN CONNECTION WITH TRACKAGE RIGHTS GRANTED TO C&O FROM DELRAY TO PELTON TO ENABLE TO OPERATE THROUGH THE DETROIT RIVER TUNNEL - IT WILL BE NECESSARY TO INSTALL CONNECTING TRACK TO CP. INSTALL BALLOON TRACK CONNECTING WITH THE ESSEX TERMINAL NEAR TECUMSEH ROAD JUST AHEAD OF THE SWITCH TO THE CP YARD. CONSTRUCTION OF 266 FEET OF TRACK INCLUDING A #8 TURNOUT. |
Sep 28/56 |
$28800.00 |
Jun 9/55 |
7713 |
EDWARD |
REMOVAL OF EASTERLY 2598 FEET OF SIDING AND REMOVAL OF EAST TURNOUT |
Jun 15/55 |
$78.80 |
Jun 9/55 |
7714 |
ALVINSTON |
REMOVAL OF 973 FEET OF TRACK AT THE WEST END OF THE NORTH SIDING AND RELOCATE TURNOUT |
Jul 18/55 |
$25.00 |
Jun 18/55 |
7718 |
RUSCOMB |
INSTALLATION OF TEMPORARY FACING POINT TURNOUT OFF THE WESTWARD MAIN TRACK AND CONNECTED TO THE EAST END OF THE OLD NORTH PASSING TRACK TO SERVE THE HURON CONSTRUCTION COMPANY |
Jun 20/55 |
$300.00 |
Jun 20/55 |
7722 |
TILLSONBURG |
REMOVAL OF EASTERLY 5059 FEET OF EASTWARD PASSING TRACK AND INSTALLATION OF NEW CONNECTION IN MAIN TRACK WITH A #10 TURNOUT |
Jul 11/55 |
$445.00 |
Jun 30/55 |
7724 |
RODNEY |
RELOCATION OF WIGWAG SIGNALS AT BLACK'S ROAD - 2.36 MILES EAST |
Aug 19/55 |
$455.00 |
Jul 12/55 |
7728 |
PELTON |
OVERHEAD GRADE SEPARATION HIGHWAY #401 |
Nov 22/55 |
|
Sep 13/55 |
7756 |
TILBURY |
REMOVAL OF THE EAST END OF THE NORTH SIDING |
Sep 20/55 |
$78.50 |
Oct 21/55 |
|
WEST LORNE |
REMOVAL OF EASTERLY 4100 FEET OF WESTBOUND PASSING TRACK |
Dec 7/55 |
|
Nov 9/55 |
|
VICTORIA |
REMOVAL OF MAIN TRACK CROSSOVER AT WEST END OF VICTORIA YARD |
Oct 25/55 |
|
Nov 11/55 |
|
VICTORIA |
REMOVAL OF TRACK #1 EASTBOUND RECEIVING YARD - 1134 FEET INCLUDING #11 TURNOUT AND DERAIL |
Oct 21/55 |
|
Nov 14/55 |
|
PERRY |
REMOVAL OF CROSSOVER BETWEEN EASTBOUND MAIN AND EASTBOUND PASSING TRACK |
Oct 18/55 |
|
Mar 6/56 |
|
CANFIELD |
INTERCONNECT EXISTING NYC FLASHING LIGHT SIGNALS WITH PROPOSED FLASHING LIGHT SIGNALS ON CN AT HIGHWAY #3 ( TALBOT ROAD ) |
Jun 21/56 |
$826.00 |
Feb 13/56 |
|
PELTON |
WORK AT PELTON FOR C&O TAKEOVER OF INTERLOCKER |
Jun 29/56 |
|
Apr 19/56 |
|
WINDSOR |
CONSTRUCTION OF 628 FEET OF STUB TRACK TO SERVE ZEKELMAN & MONO LTD. |
Nov 26/56 |
$35166.00 |
Jun 4/56 |
|
MONTROSE |
CONSTRUCTION OF 773 FEET OF TRACK TO SERVE STRATEGIC-UDY METALLURGICAL & CHEMICAL PROCESSES LTD. |
Jun 15/56 |
|
Jul 9/56 |
|
WELLAND |
REMOVAL OF EASTWARD TRAIN ORDER SIGNAL |
Jul 23/56 |
$360.00 |
Jul 13/56 |
|
HIGHGATE |
REMOVAL TRAIN ORDER SIGNAL |
Nov 30/56 |
$12.00 |
Oct 3/56 |
|
WELLAND |
CONSTRUCTION OF 2 TURNOUTS TO SERVE PAGE-HERSEY TUBES AT THEIR NEW PLANT AT FARR ROAD. 1.54 MILES EAST OF WELLAND |
Aug 24/56 |
$9950.00 |
Nov 29/56 |
|
WELLAND |
OVERHEAD GRADE SEPARATION - NIEDLES ROAD - RELOCATED - 3.5 MILES EAST OF WELLAND |
Dec 31/57 |
$24900.00 |
Mar 21/57 |
|
ST. THOMAS |
RELOCATE WIGWAG SIGNALS DUE TO WIDENING OF ELGIN STREET |
Mar 22/57 |
$421.00 |
Jul 1/57 |
7 |
WELLAND |
IMPROVE CROSSING AT CARL'S RD REPLACE WIGWAG SIGNALS WITH FLASHING LIGHT SIGNALS. RETIRE CROSSING CAMBRIDGE RD. |
Dec 31/57 |
$1565.00 |
Feb 6/58 |
|
MAINLINE |
RETIRE 46 AUTOMATIC colour LIGHT SIGNALS AND 2 TAKE SIDING SIGNALS. REARRANGE REMAINING SIGNALS UNITS TO PROVIDE MINIMUM OF 7000 FEET BLOCKS. PROVIDE ADEQUATE BRAKING DISTANCE TO PERMIT INCREASE FREIGHT TRAIN SPEED FROM 55 MPH TO 60 MPH |
Aug 14/57 |
$2620.00 |